P 5
Please retain product label and instructions for future reference
Step 8
Pre drill
hole
30mm
screw
24
28
28
14
14
Connect the ridge bars
(No.14)
together
with the metal “U”
(No.24)
channel, using
10x30mm screws. Ensure the ridge bar sits
into the U-channel with equal spacing on
each side.
Attach the “L”
(No.28)
brackets to each end
of the Ridge support with 2x30mm screws
per bracket.
*Ensure the bracket are flush with the
ends of the ridge bar.
14x30mm Screws
Parts Needed -
No.14 QTY 2
- No.24 QTY 1
- No.28 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
Step 9
Parts needed - No.14 QTY 2
- No.28 QTY 2
Pre drill
hole
30mm
screw
Align the ridge bar
(No.14)
between the gables and secure to
the central uprights with 2x30mm
screws per bracket
(No.28)
, as
shown in the illustration.
*Ensure the ridge bar is flush with
the top framing of the gable tops.
4x30mm Screws
14
14
28
Step 10
Parts needed - No.7 QTY 2
- No.15 QTY 4
50mm
screw
Pre drill
hole
Fix the Eaves framing
(No.15)
to the roof
(No.7)
using 5x50mm screws per eaves
framing, screwing through the eaves framing
and into the roof framing.
Ensure the eaves framing is flush to the
edges of the roof framing before securing
20x50mm Screws
7
15
15
7
15
15
Step 11
Parts needed- No.7 QTY 2
Place the Roofs
(No.7)
onto the top
of the building, ensuring the side
edges are flush with the building
and there is equal spacing at the
front and back.
Fix the Roofs together internally,
using 4x50mm screws in alternating
sides as shown in the diagram.
4x50mm Screws
50mm
screw
Pre drill
hole
*internal view*
7
7