P 5
Please retain product label and instructions for future reference
50mm
screw
Pre drill
hole
7
7
Step 7
Parts needed - No. 7 QTY 2
Place the Gable Tops
(No. 7)
centrally
over the end panels. Make sure that the
cladding slots together and fix into
position using 50mm screws.
Fix together using 8x50mm screws
staggering the screws so they don’t
collide.
8x50mm Screws
50mm
screw
Pre drill
hole
1
Step 6
Parts needed - No. 1, (or 2, or 4 QTY 1)
Fix the corner and end of the Door
Panel
(No. 1)
(or panel of your choice)
to the already standing chosen panel
and Small Plain Panel
(No. 3)
with
50mm screws as shown in diagram.
Do not secure the building to the floor
until the roof has been fitted,
Position the panels so there is equal
spacing between the floor and cladding
on all sides.
6x50mm Screws
30mm
screw
Pre drill
hole
Step 8
Parts needed - No. 17 QTY 2
No. 25 QTY 2
No. 28 QTY 1
Connect two Ridge Bars
(No.17)
together with the metal “U” channel
(No.28)
, using 10x30mm screws.
Ensure the ridge bar sits into the
U-channel with equal spacing on each
side.
Attach the L-shaped corner braces
(No.25)
to each end of the Ridge bar
with 2x30mm screws per bracket.
*Ensure the brackets are flush with the
ends of the ridge bar.
14x30mm Screws
17
17
25
25
28
Step 9
Align the assembled Ridge Bars
(No.17)
with the framing of the
Gables as shown.
(if you have not yet assembled your
Ridge Bar, please refer to Step 8)
Secure the brackets to the central
uprights using 2x30mm screws per
bracket
(No.29)
, as shown in the
illustration.
*Ensure the ridge bar is flush with
the top framing of the Gable panels.
4x30mm Screws
25
17
30mm
screw
Pre drill
hole