background image

P 9

Please retain product label and instructions for future reference

             

30mm 

screw

Pre drill 

hole

16

16

16

16

16

Step 18

Parts needed - No. 16 QTY 7

Fit the Cover Trims 

(No. 16)

 over each panel join 

and corner of the building as shown in the 

illustration using 30mm screws. Pre drill to avoid 

splitting.

21x30mm Screws

40mm 

screw

Pre drill 

hole

14

14

23

14

14

Step 19

Parts needed - No. 14 QTY 4

                                 No. 23 QTY 2

Fit the Fascias 

(No. 14)

 to the roof over 

the felt and secure in place with 40mm 

screws as shown.  Pre drill to avoid 

splitting.

Followed by adding the Finials 

(No. 

23)

 over the Fascias using x2 40mm 

screws per Finial.    

 

16x40mm Screws

23

Step 20

Parts needed - No. 10 QTY 1

                                 No. 15 QTY 2

30mm 

screw

Pre drill 

hole

15

15

a

b

a

b

10

Use 4x30mm Screws to fix each Door Beading 

Strip 

(No. 15)

 onto the insides of the Door Panel 

(No. 1) 

opening.  Ensure that the screw is parallel 

with the door frame when fixing the strip to the 

Door Panel as shown in the close up view.

8x30mm Screws

Attach the Inner Door Block 

(No.10) 

to the door 

(No.6)

 using 2x30mm screws, in the positions illus-

trated. Screw through the door cladding into the 

blocks using 30mm screws 

2x30mm Screws

Summary of Contents for 01DTSHOSBRAX0806SDFW-V1

Page 1: ...ll be access to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the base dimensions The base should...

Page 2: ...S1240 1792mm Ridge Bar 27x70x1152mm QTY 2 F2770 1152mm Finial QTY 2 Diamond Shed Finial Door Panel AI 01S11SHSD1180X1802 V1 Gable Top QTY 2 AI S11SHAGT1704X391 V1 Floor QTY 2 AI R11OSBF1175X1753 V1 R...

Page 3: ...ens from the Left Opens from the Right Step 1 Parts needed No 1 QTY 1 No 6 QTY 1 No 24 QTY 3 Place the door No 6 within the Door Panel No 1 Fix the T Hinges No 24 onto the door and Door Panel as shown...

Page 4: ...cladding on all sides 3x50mm Screws 50mm screw Pre drill hole 2 4 Step 4 Parts needed No 2 or 1 or 4 QTY 1 No 4 or 1 or 2 QTY 1 Fix the corners of the Large Plain Side No 5 and a Window Panel No 2 or...

Page 5: ...re is equal spacing between the floor and cladding on all sides 6x50mm Screws 30mm screw Pre drill hole Step 8 Parts needed No 17 QTY 2 No 25 QTY 2 No 28 QTY 1 Connect two Ridge Bars No 17 together wi...

Page 6: ...o 9 framing pull together when fixed with 60mm screws You may require another person pushing the ridge bar No 17 up from below to achieve this HINT Follow the nailing line of the framing on the roof p...

Page 7: ...erneath the two Roof Support Bars No 18 ensuring they sit flush to one another The Truss Brace No 20 should sit horizontal parallel to the floor Once in position fix the Truss Brace No 20 in place wit...

Page 8: ...No 21 For added weather protection fit your windows using silicone sealant around the outside edges When positioning the styrene sheets ensure there is an equal distance on all sides Attach 1x Outer W...

Page 9: ...h 40mm screws as shown Pre drill to avoid splitting Followed by adding the Finials No 23 over the Fascias using x2 40mm screws per Finial 16x40mm Screws 23 Step 20 Parts needed No 10 QTY 1 No 15 QTY 2...

Page 10: ...rew 27 Step 21 Parts needed No 27 QTY 1 Screw the Pad Bolt No 27 on to the door No 1 and the retainer to the door panel No 6 using 10x30mm screws Make sure that you screw into the framing behind 10x30...

Page 11: ...2 1 3 4...

Page 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: