background image

P 1

01OSBA0307PB-V1 (01OSBA1007DDSW-V1 & 01OSBA1307DDSW-V1)

3x7 OSB Apex Exstension pack 

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Summary of Contents for 01OSBA0307PB-V1

Page 1: ...various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior...

Page 2: ...l AI 01SHPPS1050X1567 V1 OSB Floor AI 01OSBF2066X1050 V1 Roof OSB PI 03 0338 1 2 3 4 Truss beam 1101mm F2744 1141mm ANGLED Truss centre support 360mm F2744 400mm ANGLED Truss support 140mm F2744 160mm...

Page 3: ...loors using 40mm screws 10x7 10x40mm Screws 13x7 20x40mm Screws 10x7 13x7 Pre drill hole 50mm screw Step 2 Place the 7x7 plain side flat on the ground and fix the the short plain panel with 3x50mm scr...

Page 4: ...ay Do not secure the building to the floor until the roof is fitted Fix the panels onto the floor using 50mm screws in alignment with the floor joists 10x7 3x50mm Screws 13x7 6x50mm Screws 10x7 13x7 S...

Page 5: ...the Truss beam to the Ridge bar and the Truss support Block with 2x50mm screws Repeat with opposite side and secure both Truss beams with the Truss centre support from underneath with 2x60mm screws Th...

Page 6: ...able Fix the Large Roof sheet as shown in 01OSBA0707DDSW V1 Further secure the Large Roof by fixing through the roof into the Truss with 4x40mm screws Once the large roof sheet is fixed into postion f...

Page 7: ...V1 10x7 6x50mm Screws 13x7 12x50mm Screws Step 10 Fix the Cover Trims to the building to the front and back as described in 01OSBA0707DDSW V1 10x7 Fix the two Cover Trims to the the seam of the buildi...

Page 8: ...o roof as shown ensuring there is overhang around the sides then nail the felt tacks every 100mm In addition to the 104x Felt Tacks given in the 01OSBA0707DDSW V1 10x7 25x Felt Tacks 13x7 50x Felt Tac...