P 3
Please retain product label and instructions for future reference
Remove transportation blocks from the bottom of each
panel before beginning assembly. Each Panel should
have two blocks.
Pre Assembly
30mm
screw
Pre drill
hole
Pre-assembly
Fix the T Hinges onto the
doors and door frame as
shown. Ensure that the
screws go through the
cladding and into the
framing behind.
28x30mm screws
1
7
7
20
Step 1
5
5
10 x 40mm screws
Step 1
Place floor on firm and level base, ensure
base has suitable drainage free from areas
where water can collect. (See front page on
base requirements).
Attach the floors using 10 x 40mm screws.
Do not secure the building to the
floor until the roof is fitted. Fix the
panels onto the floor using 50mm
screws in alignment with the floor
joists
Step 2
Fix the corners with 50mm screws
as shown in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
3
2
3x50mm Screws
Pre drill
hole
50mm
screw