50mm
screw
Pre drill
hole
P 3
Please retain product label and instructions for future reference
Step 2
Place the floor (
No. 4
) onto a firm
and level base. Ensure your base
has suitable drainage and is free
from areas where standing water
can collect.
4
2
3
a
b
a
b
b
b
Step 3
Sit the plain gable (
No.3
) and the first plain
side (
No. 2
) onto the floor.
*Ensure the plain gable sits inside the plain
side.
Fix the panels at the corner using
3x 50mm screws.
Do
NOT
secure the building to the
floor until the roof has been fitted.
3x50mm Screws
a
b
a
a
a
a
a
a
a
a
a
b
b
b
50mm
screw
Pre drill
hole
Step 4
Rest the assembled door gable (
No.1
) and the
second plain side (
No. 2
) onto the floor.
*Ensure the door gable sits inside the plain
sides.
Fix the panels at the corner using
9x 50mm screws.
Do
NOT
secure the building to the
floor until the roof has been fitted.
9x50mm Screws
a
b
2
1
14
7
a
b
Step 5
Attach the “L” brackets (
No. 14
) to each
end of the ridge bar (
No. 7
), ensuring
the backs are flush with the edge of the
framing using 2x20mm screws per “L”
bracket.
Fix to both gables centrally
with 2x30mm screws per side.
4x20mm Screws
4x30mm Screws
Pre drill
hole
20mm
screw
30mm
screw
b
a