background image

P 6

Step 11

b

c

Use 4x30mm Screws to fix 

each beading strip onto the 

door gable. Ensure that the 

screw is parallel with the 

door frame when fixing the 

strip to the door gable as 

shown in the close up view.

Attach the turn button to 

the top and bottom door 

blocks with 1x30mm screw 

for each one.

First line up the door blocks 

at the top and bottom of the 

doors. Then fix with 

2x30mm screws by screwing 

through the outside of the 

door  into the block.

8x30mm Screws

2x30mm Black Screws

4x30mm Screws

b

c

a

13

20

14

a

13

20mm 

screw

30mm 

screw

Use 5x20mm screws to fix 

the door strips to the right 

hand door.

 

Note - Door Strips must be 

attached to right hand door

Use 1x30mm black screw to 

fix the turn button onto the 

left hand door.

5 x 20mm Screws

1x 30mm Black Screw

Step 12

12

11

20

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Summary of Contents for 01OVLPA0806DDFW-V2

Page 1: ...annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treat ment to prevent water ingress Pressure Treated buildings Require a waterproof treatment to prevent water ingress Log Cabins Are supplied untreated and require a prese...

Page 2: ...rene QTY 2 FW ONLY PI 05 0114 18 19 21 L Bracket QTY 2 PI 07 0012 16 Capping Felt Turn Button QTY 3 PI 07 0034 20 22 15 Eaves Frame 28x28x1195mm QTY 4 F2828 1195 24 23 Door Gable QTY1 AI 01OVLPDG1707x1960 V2 Back Gable QTY1 AI 01OVLPPG1707x1974 V3 Plain Side QTY 2 NW ONLY AI 01OVLPPS2360x1567 V3 Window Panel QTY 1 FW ONLY AI 01OVLPWS2360x1567 V2 Floor QTY 1 AI 01OVLPF2350x1753 V2 Roof QTY 2 PI 03 ...

Page 3: ... diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides Step 2 3x50mm Screws Pre drill hole 50mm screw Step 3 9x50mm Screws Fix the corners with 50mm screws as shown in diagram 1 4 Use for no window buildings 3 Pre drill hole 50mm screw Step 4 8x20mm Screws Place the ridge bar in between the front and back gables Ensure the top corners of the ridge bar ...

Page 4: ...m screw Pre drill hole Pre drill hole Step 6 b Once the roof is fixed attach the building to the floor with 50 mm screws 16x 50mm Screws 50mm screw Pre drill hole 100x Tacks Felt tacks 21 22 22 21 Step 7 Cut the felt into 2 sheets at 2490mm and fix onto the roof using felt tacks as shown in diagram ensuring there is 50mm overhang around the sides Cut the capping felt to 2490mm and fix over the cen...

Page 5: ...ne sheets on top of the window cill When positioning the styrene sheets ensure there is an equal distance between them and at either side of the windows Fix the window strips to the two pieces of framing that sit alongside the outside edges of the window with 3x30mm screws for each strip Attach the three window strips at either side of the windows using 3x30mm screws each Make sure the screws ente...

Page 6: ...screws by screwing through the outside of the door into the block 8x30mm Screws 2x30mm Black Screws 4x30mm Screws b c a 13 20 14 a 13 20mm screw 30mm screw Use 5x20mm screws to fix the door strips to the right hand door Note Door Strips must be attached to right hand door Use 1x30mm black screw to fix the turn button onto the left hand door 5 x 20mm Screws 1x 30mm Black Screw Step 12 12 11 20 It i...

Reviews: