background image

P 4

Step 1

Remove transportation blocks 

from the bottom of each panel 

before beginning assembly. Each 

Panel should have two blocks.

x10 50mm Screws

6

6

Step 2

Place the 

floor

 on a firm and 

level base, ensure base has 

suitable drainage  free from 

areas where standing water can 

collect.  (See front page on 

base requirements).  Ensure 

floors are flush to each other 

and fix using 10x50mm screws. 

Alternate fixing positions along 

the length of the floors.

Step 3

Do not secure the building to 

the floor until the roof is fitted. 

Fix the panels onto the floor 

using 50mm screws in align-

ment with the floor joists

Fix the corners with 50mm 

screws as shown in diagram.

Position the panels so there is equal spacing 

between the floor and cladding on all 4 sides

x6 50mm Screws

2

Window panel can be fitted on 

either left or right side

6

6

3

3

Step 4

Fix 

door gable

 and 

plain side

 

panels using same method 

shown in step 3.

x12 50mm Screws

3

2

5

1

Please retain product label and instructions for future reference

             

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Summary of Contents for 01PTGRO1208DD-V3

Page 1: ...to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and dec...

Page 2: ...trip 12 x 44 x 1732mm QTY 2 S1245 1732MM Window Strip 12 x 45 x 1055mm QTY 2 S1245 1055MM 22 T Hinge QTY 6 PI 02 1045 23 Butt Hinge QTY 4 PI 07 0066 25 Nail Bag Casement Stay x2 PI 07 0007 138x30mm Sc...

Page 3: ...w If you want to fix the opening windows instead of fixing butt hinges to the opening window use 4x30mm screws to attach the opening windows to the window panel as shown in the diagram SCREW COUNT PER...

Page 4: ...xing positions along the length of the floors Step 3 Do not secure the building to the floor until the roof is fitted Fix the panels onto the floor using 50mm screws in align ment with the floor joist...

Page 5: ...panels are facing each other at the top point 40x 30mm Screws 5 1 4 4 4 4 12 Secure the truss support 51mm from the top edge 14 Fix the last two truss supports to the assembly with 2x40mm screws per...

Page 6: ...4 5 10 10 10 Step 11 Use 40mm screws to fix each fascia block fascia and Shed Diamond 4 4 1 25 9 18x 40mm Screws 15 15 Step 12 To fix the lock in place Screw the Staple to the Door Gable or Slave door...

Page 7: ...rotective cover on glazing and carefuly peel covering back 30mm screw Pre drill hole 19 Place the Cloaking Strip to the rear of one of the doors Fixing in position screwing through the door into the c...

Reviews: