P 4
Step 1
Remove transportation blocks
from the bottom of each panel
before beginning assembly. Each
Panel should have two blocks.
x10 50mm Screws
6
6
Step 2
Place the
floor
on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water can
collect. (See front page on
base requirements). Ensure
floors are flush to each other
and fix using 10x50mm screws.
Alternate fixing positions along
the length of the floors.
Step 3
Do not secure the building to
the floor until the roof is fitted.
Fix the panels onto the floor
using 50mm screws in align-
ment with the floor joists
Fix the corners with 50mm
screws as shown in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
x6 50mm Screws
2
Window panel can be fitted on
either left or right side
6
6
3
3
Step 4
Fix
door gable
and
plain side
panels using same method
shown in step 3.
x12 50mm Screws
3
2
5
1
Please retain product label and instructions for future reference
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk