background image

Step 4

Place the roof sheet (

No. 5

) onto the 

building and fix into position using 30mm 

screws as shown in the illustration.

10x30mm Screws

50mm 

screw

Pre drill 

hole

50mm 

screw

Pre drill 

hole

7

3

30mm 

screw

Pre drill 

hole

5

Step 5

Attach the first two trims (

No. 10

) to

the front of the building (

underneath

the front panel

) fixing each trim using

3x30mm screws.

*Ensure the trims are flush at each

side with the boarding anfd the

framing.

6x30mm Screws

30mm 

screw

Pre drill 

hole

Please retain product label and instructions for future reference

             

Step 2 

 

Place the back panel (

No. 1

)  

 

and right gable (

No. 2

) onto  

 

the floor and

 

fix the corners  

 

with50mm screws as shown  

 

in diagram.

 

Do not secure the building  

 

to the floor until the roof is  

 

fitted. Fix the panels onto  

 

the floor using 50mm    

 

screws in alignment with  

 

the floor joists

3x50mm Screws

a

a

1

2

a

b

a

b

b

b

b

b

b

Step 3 

 

Following the same method 

 

outlined in 

Step 2

 place the

 

left gable (

No. 3

) and the  

 

front panel (

No. 7

) onto the

 

assembly and secure using

 

50mm screws.

 

Do not secure the building  

 

to the floor until the roof is  

 

fitted. Fix the panels onto  

 

the floor using 50mm    

 

screws in alignment with  

 

the floor joists

9x50mm Screws

a

b

a

a

a

a

a

b

b

Reviews: