background image

H=220cm W=140cm L=130cm

30mm Black Screw x 12

P 2

01SHPWOR1610DDOW-V1

Please retain product label and instructions for future reference

             

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

Overall Dimensions:

 

Length = 4756mm 

Width = 3179mm

Height = 2485mm

Base Dimensions: 

Length = 4716mm

Width = 3010mm

Building content

2

1

3

4

5

6

Plain Side

Qty 2

Window Side

Qty 2

Floor

Qty 3

Roof Panel

Qty 4

8

Front

Gable

Right

Front

Gable

Left

Front

Gable

Top

Back Gable

Right

Back Gable

Left

9

Truss Block - 160mm Qty 2

Door Gable Rail - 1332mm 

Tower Catch Block - 118mm Qty 2

15

12

13

16

14

18

Truss

Plain Gable Strip - 2426mm 

Cover Trim - 1757mm Qty 11

19

Finial 

Qty 2

24

21

T Hinge

Qty 6

Felt

25

casement stay 
QTY 2

Butt hinge QTY 4

Open

Window 

Frame

27

23

28

Rim Lock

& Handle

22

Tower Bolt QTY 2

26

7

10

Master

Door

Slave

Door

11

17

Door Gable Strip - 2552mm

Cover Strip - 2800mm Qty 3

20

29

“U” Bracket QTY 4

30

Plain Gable Board

Gable Block - 342mm

Nail Bag

30mm Screw x 85

20mm Screw x 12

50mm Screw x 82

70mm Screw x 6

40mm Screw x 172

Felt Tacks x 245

16mm Screws x 12         

100mm Screw x 2

Remove transportation 
blocks from the bottom 
of each panel before 
beginning assembly. Each 
Panel should have two 

Pre Assembly 

Door Gable Assembly 

Step 1

2 x 50mm screws

Lay the Front Gable Right and Front Gable 
top on a level floor place them next to each 
other, ensure they are level at the top then 
fix together using 2x50mm screws. Stagger 
the screws so they do not collide.

1

3

50mm 

screw

Pre drill 

hole

Summary of Contents for 01SHPWOR1610DDOW-V1

Page 1: ...pre treated with a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is treated with a wood preserver within the first three months of assembly and thereafter in accordance with the manufactures recommendations Care must be taken to ensure the pr...

Page 2: ...over Trim 1757mm Qty 11 19 Finial Qty 2 24 21 T Hinge Qty 6 Felt 25 casement stay QTY 2 Butt hinge QTY 4 Open Window Frame 27 23 28 Rim Lock Handle 22 Tower Bolt QTY 2 26 7 10 Master Door Slave Door 11 17 Door Gable Strip 2552mm Cover Strip 2800mm Qty 3 20 29 U Bracket QTY 4 30 Plain Gable Board Gable Block 342mm Nail Bag 30mm Screw x 85 20mm Screw x 12 50mm Screw x 82 70mm Screw x 6 40mm Screw x ...

Page 3: ...mm screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they are level at the top and bottom then fix together using 10x50mm screws Stagger the screws so they do not collide 50mm screw Pre drill hole 30 Turn the gable section over and secure the top board in pla...

Page 4: ...l hole Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides Step 5 3x50mm Screws 4 5 7 50mm screw Pre drill hole Step 6 Fix the remaining window side and the splain side at the corner with 50mm screws as shown in diagram 6x50mm Screws 5...

Page 5: ...rners with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole Cut down trims to fit Measure the length of the door gable rail and cut down a strip match Fix in place using 2x30mm screws Step 9 Fit the Door Gable Rail between the Front Gable Left and Right Fix to the floor using 3x50mm screws Ensure screws line up with the framing 3x50mm Screws 50mm screw Pre drill hole 30mm sc...

Page 6: ...tep 10 30mm screw Pre drill hole Step 11 Place a Truss central to where two panels join Align the top of the truss with the top of the sides as shown in the diagram HINT Use a piece from the fixing kit as a guide Pencil mark the truss position and remove truss Place the truss blocks up to the pencil mark and fix using 2x70mm screws per block Place the truss back into position on top of the support...

Page 7: ... drill hole Place the fist two roof sheets ontop of the plain gable and truss making sure the roof sheet sits into the gables and truss securing using 40mm screws Ensure there is an eqal amount of overhang on either side of the building 16x40mm Screws 40mm screw Pre drill hole Secure the roof panels together using the metal U channels and 6x40mm screws per U channel 24x40mm Screws 40mm screw Pre d...

Page 8: ...rill hole HANDLE WITH CARE 1 2 3 4 245 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below Once the sheets are laid out fix them onto the roof with tacks 100mm apart 1 2 3 4 Felt Strip Sizes 4860mm Felt tacks B B B B B ...

Page 9: ...ables join using 4x40mm screws Pre drill to avoid splitting 28x40mm Screws 19 18 18 40mm screw Pre drill hole Cut down trims to fit 16x40mm Screws Fit the fascias to the roof over the felt and secure in place with 40mm screws as shown Pre drill to avoid splitting Measure and trim down to size 40mm screw Pre drill hole 18 18 18 18 18 18 24 18 18 24 ...

Page 10: ... use the butt hinges to attach the opening window strip and the opening window together Use 30mm screws to fix the butt hinge to the Window Strip and 16mm screws to fix it to the Opening Window If you want to fix the opening windows instead of fixing butt hinges to the opening window use 4x30mm screws to attach the opening windows to the window panel as shown in the diagram 6x30mm Screws 6x16mm Sc...

Page 11: ...rews 22 Rim lock fixing Fig 1 internal view Place the lock onto internal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provided Do not over tighten the screws otherwise the locking mechanism will not work Fig 2 Place door handle bar through the lock as in diagram fix door handle onto bar with the flat headed grub screw fi...

Page 12: ...P 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back ...

Reviews: