background image

*Before fixing the door gable, check 

the top and bottom of the door and 

remove any transit screws . Make sure 

door opens and closes freely. Adjust 

hinge position if necessary.

Step 3

Fix door gable and window side 

using same method shown in 

step 2.

Position the panels so there is 

equal spacing between the floor 

and cladding on all four sides.

17 x 50mm screws

4

1

50mm 

screw

Step 4

Place roof purlins inbetween 
each gable upright as shown in 
illustration below, Use 1x70mm 
screw per end. Screw through 
the outside of building, into 
into framing.

*

Ensure all fitted screws do       

  not protrude from framing            
  and any splinters on surface   
  are removed. We    
  recommend finshing     
  framing surfaces with sand  
  paper to remove any   
  splinters.

Purlins

Ensure both purlin
edges are flush 
with rafters

Rafters

6x70mm screws

9

9

70mm 

screw

30mm 

screw

7

5

Step 5

Screw the Eaves on to the 
bottom of the large roof 
sheet, Using 6x 30mm screws.

Fix roof sheets into postition 
using 30mm screws, straight 
into the rafter. Pre drill holes 
before hand. 
Start at the bottom align the 
osb sheet with the purlins.

34x30mm Screws

6

Step 6

120 x felt tacks

16

Cut felt into 3 sheets and lay 
onto roof as shown in 
diagram ensuring there is a 
50mm overhang around the 
sides. 

fix using felt tacks at 100mm 
intervals

Felt 

tacks 

Reviews: