P 3
Please retain product label and instructions for future reference
50mm Screw x 141
20mm Screw x 64
10mm Screw x 8
40mm Screw x 52
30mm Screw x 136
Nail Bag
70mm Screw x 15
60mm Screw x 12
Felt Tacks x 300
There may be extra screws present in the nail bag
Pre Assembly
Remove the transportation blocks from
the bottom and top of each panel
before beginning assembly.
Step 1
Parts needed - No. 21 QTY 1
No. 24 QTY 1
Secure the Door Strip
(No. 24)
with
the edges being flush
to the Door
Stop Frame
(No. 21)
using
5x30mm screws.
5 x 30mm Screws
Pre drill
hole
30mm
screw
21
21
24
24
SIDE VIEW
21
24
Step 2
Parts needed - No. 4 QTY 2
No. 6 QTY 1
No. 21 QTY 1
No. 24 QTY 1
Lay all of the required parts on to a
flat level surface and fix the Upper
Door Panel
(No. 6)
in the centre of
the two Front Window Panels
(No.
4)
with 3x50mm screws per side.
The Upper Door Panel should be
flush with the top of the left and
right Panels.
Fix the (already assembled in the
Step 1.) Door Strip
(No. 24)
and the
Door Stop Frame
(No. 21)
to the
bottom of the Front Window Panels
(No. 4)
with 2x50mm screws per
side. The Door Stop Frame should
be flush with the bottom framing of
the Front Window Panels
(No. 4)
.
10 x 50mm Screws
4
6
4
Pre drill
hole
50mm
screw