P 8

Please retain product label and instructions for future reference

             

Step 14

Parts needed - No. 7 QTY 2

 

 

   No. 8 QTY 2

 

 

   No. 9 QTY 2

 

 

   No. 10 QTY 2

 

 

   No. 34 QTY 1

Roll out the Felt (

No. 34

) and use the Roof 

Panels (

No. 7, 8, 9 & 10

) as shown in the 

illustration so you can accuartely cut the 

felt before fitting. 

Leave a 100mm space between each panel 

and cut through the centre to create 

50mm overhang for each strip.  Make sure 

that there is a 50mm  overhang under each 

panel

Measure and cut four strips of felt (

No. 34

at 1600x200mm.

Measure and cut one full width strip of felt 

(

No. 34

) at 2600mm long.

Once all the pieces of felt have been cut 

keep these to one side whilst you 

construct the roof.

1600x200mm

QTY 4

HANDLE

WITH CARE

1

2

3

4

100mm gap between each panel

50mm overhang 

below each panel

50mm overhang 

below each panel

50mm overhang 

below each panel

2600mm

QTY 1

1

2

3

4

34

Step 15

Parts needed - No. 14 QTY 1

  

    

   No. 15 QTY 5

Pre drill holes in the underside of 

Roof Bearer A 

(No. 14)

 and all 5 of 

the  Roof Bearer B  

(No. 15)

 parts 

with an offset position of 

40 mm

 

from each of the pointed ends in 

the centre of the bearers.  These 

holes are going to later recieve 

60mm screws.

Pre drill 

hole

14

15

15

14

SIDE VIEW

UNDERNEATH VIEW

40mm

SIDE VIEW

UNDERNEATH VIEW

Step 16

Parts needed - No. 7 QTY 2

Place both 6ft Roof Panels 

(No. 7) 

on the floor and measure 

195mm

 

from the top of the Framing and 

mark the distance on the vertical 

framing with a line.

Repeat this step for both roof 6Ft 

Roof Panels 

(No. 7)

 .

7

195mm

Summary of Contents for 03DTMBHP1206RFP

Page 1: ...oisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as...

Page 2: ...996mm QTY 1 S1240 996mm Roof Bearer A 44x58x2211mm QTY 1 F4458 G 2251mm 2x32 CUTS 26 8 19 27 28 10 11 Eaves Frame 28x28x1805mm QTY 6 FS2828 1805mm 20 Building Content Roof Bearer B 44x58x528mm QTY 5 F...

Page 3: ...g 5x30mm screws 5 x 30mm Screws Pre drill hole 30mm screw 21 21 24 24 SIDE VIEW 21 24 Step 2 Parts needed No 4 QTY 2 No 6 QTY 1 No 21 QTY 1 No 24 QTY 1 Lay all of the required parts on to a flat level...

Page 4: ...nt Window Panel No 4 with 3x30mm screws per hinge Then fix the T hinges No 36 to the door with 3x30mm screws per hinge Repeat the process for the Master Door No 12 36 x 30mm Screws 36 36 Pre drill hol...

Page 5: ...e drill hole 50mm screw 11 11 11 11 1 1 1 1 Step 6 Parts needed No 3 QTY 2 No 5 QTY 2 Fix the Side Window Panel No 3 and the Plain Panel No 5 togeth er by screwing through the fram ing using 5x50mm sc...

Page 6: ...his is to be fitted to the opposite side 3 5 2 5 Step 8 Parts needed No 2 QTY 1 No 3 QTY 1 No 5 QTY 2 Place the two Plain Panels No 5 that were assembled with the Side Window Panel No 3 and the Back P...

Page 7: ...Pre drill hole 50mm screw 4 4 5 5 Step 12 Parts needed No 4 QTY 2 Place the already assembled Door Panel No 4 6 12 13 22 25 into position and fix together with the two front plain panels No 5 3x50mm s...

Page 8: ...de whilst you construct the roof 1600x200mm QTY 4 HANDLE WITH CARE 1 2 3 4 100mm gap between each panel 50mm overhang below each panel 50mm overhang below each panel 50mm overhang below each panel 260...

Page 9: ...these panels have not been assembled yet please refer to step 13 Repeat this step for both sets of assembled roof panels No 8 9 10 8 10 9 Step 18 Parts needed No 14 QTY 1 No 16 QTY 5 Fix the Roof Bloc...

Page 10: ...2 No 8 QTY 1 No 9 QTY 1 No 10 QTY 1 No 14 QTY 2 No 16 QTY 5 The use of a step ladder is essential to construct the roof To construct the Roof place the previously assembled in Step 19 6ft Roof Panel N...

Page 11: ...the framing of the roof panels and that the pointed corners meet the line that was drawn in a Step 16 The underside of the roof should look as shown 10x60mm Screws Pre drill hole 60mm screw 15 15 15...

Page 12: ...e screws go into the framing behind 24x40mm Screws Pre drill hole 40mm screw 22 22 22 22 22 22 Step 26 Fix the roofs to the panels below by screwing down through the roofs into the panel framing below...

Page 13: ...felt using felt tacks with even spaces of 100mm between each tack 300x Felt tacks C B A A B C 1 2 3 4 34 Step 29 Parts needed No 19 QTY 4 No 20 QTY 2 Secure the Fascias No 19 20 to the building using...

Page 14: ...g 5x30mm screws 5x30mm Screws Pre drill hole 20 33 33 20 33 33 30mm screw Step 32 Parts needed No 26 QTY 12 Fix the Cover Trims No 26 to each corner and over each join of the buiding with 3x30mm screw...

Page 15: ...er hinge Repeat this step for both window sides of the building 20x20mm Screws Pre drill hole 20mm screw 31 35 31 Step 35 Parts needed No 29 QTY 1 No 30 QTY 2 On the internal of the doors fix the Towe...

Page 16: ...that the edges are flush with the framing Fix with 4x30mm screws per strip 12x30mm Screws Pre drill hole 30mm screw 28 28 27 27 27 Step 38 Parts needed No 37 QTY 2 On the outside of the building fix t...

Page 17: ...ng 1x10mm screw at each meeting point as shown in the diagram 24x20mm screws 8x10mm screws0mm screw20mm screw Pre drill hole 10mm screw 20mm screw 18 18 17 18 18 18 18 18 18 17 17 17 Please retain pro...

Page 18: ...2 1 3 4...

Page 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: