P 6
Please retain product label and instructions for future reference
Step 12
Secure the building to the floor . Fix the
panels onto the floor using 50mm
screws in alignment with the floor joists
*Ensure to screw through the framing
into the floor bearers.
30x50mm Screws
50mm
screw
Pre drill
hole
Step 15
Parts needed - No.33 QTY 2
No.34 QTY 1
b b
b b
b
b
b
b
b
b
b
b
b
b
b
35mm
bolt
33
35
Pre drill
hole
10mm
screw
25mm
screw
34
Fix the door handles
(No.35)
to the
outside of the master and secondary door
using the 35mm bolts provided.
Fix the Turn buttons
(No.29)
at the top and
bottom of the secondary door using
2x30mm screws.
2x30mm Screws
4x35mm Bolts
Step 14
Parts needed - No. 29 QTY 2
- No. 35 QTY 2
35
Secure the barrel bolts
(No.33)
to the top
& bottom of the secondary door using
6x10mm screws.
Attach the press lock
(No34)
to the master
door with 4x25mm screws, aligning the
barrell with the key hole.
*Ensure the key turns and locks properly
before fixing to the door.
12x10mm Screws
4x25mm Screws
Pre drill
hole
INTERIOR
EXTERIOR
MASTER DOOR
MASTER DOOR
SECONDARY DOOR
SECONDARY DOOR
10mm
screw
29
29
29
35
INTERIOR
Step 13
Parts needed - No.15 QTY 1
- No.16 QTY 2
Fit the Door Strip
(No.15 and
No.16)
to the framing of the door
panel, secure using 3x30mm screws
per strip
9x30mm Screws
30mm
screw
Pre drill
hole
15
16
16
Summary of Contents for 03DTSHCR0808FGD2TW-V1
Page 9: ...2 1 3 4...
Page 10: ...1 2...