background image

P 5

Please retain product label and instructions for future reference

             

Step 5

Following the same method outlined

in step 3, place the assembled door

panel onto the floor inbetween the 

gables.

 

Fix the panels together at the 

 

corners using 3x50mm screws

 

per side.

 Do 

NOT secure the building to

 

the floor until the roof is fitted.

6x50mm Screws 

a

b

Pre drill 

hole

50mm 

screw

a

b

b

b

b

b

b

b

a

a

a

a

a

a

1

a

9

10

9

b

40mm 

screw

Pre drill 

hole

80mm 

screw

Step 6

 

Place the first ridge bar 

(No.9)

 

inside the building and line up with 

the upright   framing on each gable.  

 

Align the back edge of the ridge bar 

with the top of thegable. Once in 

place mark the position on both sides 

with a pencil. 

Place the roof support block 

(No. 10) 

to the pencil mark and secure in place 

using 2x40mm screws per block.

*Repeat this process on both sides 

with the remaining roof support bars.

 

Place the ridge bar(s) on top of 

the attached blocks and secure 

through the outside of both gables 

using   2x80mm screws per side.

12x40mm Screws

12x80mm Screws

 

a

b

*Hint: 

When fitting the roof bar pencil mark the centre

of the roof support bar and follow down onto the gable 

at a right angle, this will give you a guide to fix the 

support bars in place.

Summary of Contents for 03HEL1008DDFW-V3

Page 1: ...ur garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these proce...

Page 2: ...1X101 V1 Building Content Roof Block 28x28x140mm QTY 6 FS2828 G 160mm angled Large Rain Guard 28x44x1272mm QTY 1 RG2844 1272mm Small Rain Guard 28x44x580mm QTY 4 RG2844 580mm Roof End 100x12x2950mm QTY 2 MB12RT100 2950mm Door Beading 17x12x1711mm QTY 2 S1217 1711mm Bottom Roof Trim 45x12x1454mm QTY 4 S1245 1454mm Top Roof Trim 45x12x1485mm QTY 4 S1245 1485mm Fascia 95x12x1516mm QTY 2 SR1295 1516mm...

Page 3: ...crews 30mm screw Pre drill hole Step 2 Join the flush hinges No 25 to the door frames No 7 8 using 30mm screws Ensure hinges are attached using the outer plate of the hinge Fit the doors to the door panel with 30mm screws making sure to use the inner plate of the hinge Fit the mortice lock No 25 into the recess and fix in place with the screws provided Fit the key plate No 25 to the opposite door ...

Page 4: ...ws Step 2 Continued 20 14 14 27 d e e d Step 3 Place the back panels No 4 and the right gable No 2 onto the floor Fix the panels together at the corners using 3x50mm screws Do NOT secure the building to the floor until the roof is fitted 6x50mm Screws a b Pre drill hole 50mm screw a b a b b b b b b b 2 4 a a a a a a a b b b Step 4 Following the same method outlined in step 3 place the left gable N...

Page 5: ...ding and line up with the upright framing on each gable Align the back edge of the ridge bar with the top of thegable Once in place mark the position on both sides with a pencil Place the roof support block No 10 to the pencil mark and secure in place using 2x40mm screws per block Repeat this process on both sides with the remaining roof support bars Place the ridge bar s on top of the attached bl...

Page 6: ...ars Fix the roof bar to the supports where they meet internally using 8x40mm screws Repeat this process with the second roof panel 56x40mm Screws 40mm screw Pre drill hole 13 13 Step 8 Position the roof ends No 13 onto the roof ensuring the tongue and groove align and the boards sit flush together Secure each board to the gable framing using 6x30mm screws 12x30mm Screws 30mm screw Pre drill hole b...

Page 7: ...uilding with 165x felt tacks at 100mm intervals 190x Felt Tacks 1 2 4 3 28 HANDLE WITH CARE 1 2 3 4 16 16 15 15 Step 11 Sandwhich the felt either side between the roof and the top No 15 and bottom No 16 roof trims fixing each strip to the roof with 3x30mm screws 24x30mm Screws 30mm screw Pre drill hole 21 17 Step 12 Fix the fascia s No 17 to the front of the building using 4x40mm screws Attach the...

Page 8: ... 2x30mm screws These turn buttons help keep your doors straight during high and low levels of moisture content in the air 2x30mm Screws 30mm screw Pre drill hole Slave Door Locking Door 26 12 12 12 12 11 50mm screw Pre drill hole Step 15 Fix the large rain guard No 11 above the door using 4x50mm screws Attach the small rain guards No 12 above each window using 3x50mm screws per sml rain guard Seal...

Page 9: ...label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back ...

Page 10: ... 2 1 3 4 ...

Page 11: ... 1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE ...

Reviews: