background image

P 3

Please retain product label and instructions for future reference

             

Remove transportation blocks 

from the bottom of each panel 

before beginning assembly. 

Each Panel should have two.

Pre Assembly 

30mm 

screw

Pre drill 

hole

24

7

8

1

25mm 

screw

Step 1

Parts needed - No. 1      QTY 1

 

 

   No. 7      QTY 1

 

 

   No. 8      QTY 1

  

 

   No. 24   QTY 1

Attach the butt hinges 

(No. 24) 

to the 

doors 

(No. 7 & 8) 

using 3x25mm 

screws and to the door panel 

(No. 1)

 

using 3x30mm screws per hinge.

18x25mm Screws

18x30mm Screws

7

Step 2

Parts needed - No. 23    QTY 2

 

 

   No. 27    QTY 1

Position press lock 

(No. 27) 

on the master 

door 

(No. 8)

 align with key hole and fix 

into position using 4x10mm screws.

Fit the barrel bolts 

(No. 23)

 to top and 

bottom of the secondary door 

(No. 7) 

as 

shown in diagram. Use 4x10mm screws 

per barrel bolt.

Ensure doors open and close freely.

Drill a hole in the framing above and 

below the door for the tower bolt to fix 

into.

8x10mm Screws

4x16mm Screws

Pre drill 

hole

10mm 

screw

16mm 

screw

23

27

8

Step 3

Parts needed - No. 25     QTY 2

Pre drill holes then fix Chrome 

Handle 

(No. 25) 

using 35mm 

coach screw as shown in 

diagram.

4x35mm Bolt

Pre drill 

hole

35mm

bolt

25

Summary of Contents for 03TGCOR0707-V5

Page 1: ...arden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration...

Page 2: ...1212mm 17 Cover Trim 12x40x1918mm QTY 4 S1240 1918mm 18 Rain Guard 28x44x680mm QTY 2 RG2844 680mm Rear Cover Trim 12x60x1800mm QTY 2 S1260 1800mm 19 20 Rain Guard 28x44x990mm QTY 1 RG2844 990mm 1 2 3...

Page 3: ...x30mm Screws 7 Step 2 Parts needed No 23 QTY 2 No 27 QTY 1 Position press lock No 27 on the master door No 8 align with key hole and fix into position using 4x10mm screws Fit the barrel bolts No 23 to...

Page 4: ...until the roof is fitted 6x60mm Screws 2 2 1 Step 6 Parts needed No 4 QTY 1 No 14 QTY 1 Place rear panel left No 4 against the floor and the window side Fix the corners with 3x50mm screws as shown in...

Page 5: ...No 28 and 4x30mm screws per bracket as shown in the bubble diagram 8x30mm Screws 6 40mm screw Pre drill hole Step 10 Parts needed No 6 QTY 1 Place the roof panel No 6 on top of the building ensure th...

Page 6: ...s shown in diagram at the dotted lines use fascia width as a cutting guide Cut the triangle with 50mm overhang again using fascia as a guide 100x Felt Tacks 29 F r o n t Corner Corner Triangle 3 HANDL...

Page 7: ...12 Step 16 Parts needed No 12 QTY 1 No 13 QTY 1 Secure the front No 13 and rear No 12 roof framing to the underside of the roof fixing in place using 6x40mm screws 6x40mm Screws 40mm screw Pre drill...

Page 8: ...to the top and sides of the doors frames Make sure that the edges are flush with the edge of the framing Fix with 4x30mm screws per strip 12x30mm Screws Pre drill hole 30mm screw 22 21 21 22 21 It is...

Page 9: ...2 1 3 4...

Page 10: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Reviews: