P 3
Please retain product label and instructions for future reference
Remove transportation blocks
from the bottom of each panel
before beginning assembly.
Each Panel should have two.
Pre Assembly
30mm
screw
Pre drill
hole
24
7
8
1
25mm
screw
Step 1
Parts needed - No. 1 QTY 1
No. 7 QTY 1
No. 8 QTY 1
No. 24 QTY 1
Attach the butt hinges
(No. 24)
to the
doors
(No. 7 & 8)
using 3x25mm
screws and to the door panel
(No. 1)
using 3x30mm screws per hinge.
18x25mm Screws
18x30mm Screws
7
Step 2
Parts needed - No. 23 QTY 2
No. 27 QTY 1
Position press lock
(No. 27)
on the master
door
(No. 8)
align with key hole and fix
into position using 4x10mm screws.
Fit the barrel bolts
(No. 23)
to top and
bottom of the secondary door
(No. 7)
as
shown in diagram. Use 4x10mm screws
per barrel bolt.
Ensure doors open and close freely.
Drill a hole in the framing above and
below the door for the tower bolt to fix
into.
8x10mm Screws
4x16mm Screws
Pre drill
hole
10mm
screw
16mm
screw
23
27
8
Step 3
Parts needed - No. 25 QTY 2
Pre drill holes then fix Chrome
Handle
(No. 25)
using 35mm
coach screw as shown in
diagram.
4x35mm Bolt
Pre drill
hole
35mm
bolt
25