P 5
Please retain product label and instructions for future reference
Step 7
Fix the Roof Supports
(No.20)
to the
Gable Framing with 3x40mm screws
per Roof support.
Place the Roof bearer
(No. 19)
onto the
the Roof Supports
(No.20)
and secure
in place using the L brackets
(No.27)
and 4x30mm screws.
**Do not fix to the Floor until the
Roof is fiitted.
8x30mm screws.
6x50mm screws.
Pre drill
hole
30mm
screw
40mm
screw
20
19
27
19
20
20
27
27
Step 8
Place a Roof panel
(No. 7)
onto the
front of the building, making sure
the Roof rests into the gaps of the
gable framing.
Make sure the 12mm overhang is at
the apex of the building.
**Do not fix to the Floor until the
Roof is fiitted.
7
Pre drill
hole
50mm
screw
Step 9
Place Roof panel B
(No. 12)
onto
the rear of the building, making
sure the Roof rests into the gaps
of the gable framing.
Make sure the Roof is flush to the
rear of the building and secure
with 6x50mm screws as shown.
**Do not fix to the Floor until
the Roof is fiitted.
6x50mm screws.
12
Pre drill
hole
20mm
screw
Step 10
Once the Roof and Roof B are on
the building, Secure the roofs
together with a U-channel
(No. 29)
straddling the framing of the Roof
and Roof B, fix with 20mm screws.
**Do not fix to the Floor until the
Roof is fiitted.
6x20mm screws.
28
7
12