background image

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Please retain product label and instructions for future reference

             

Summary of Contents for 03WES1208-V2

Page 1: ...sed treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is t...

Page 2: ...eranda Rail 03WESVRDRL V1 10 Window QTY 2 01OW V1 11 Glazing QTY 4 PI 05 0038 12 29 25 27 26 28 34 30 31 32 Final QTY 2 33 13 14 15 16 17 18 19 Veranda Support 27x44x1685mm QTY 2 F2744 1685mm Fascia 1...

Page 3: ...h door to the door gable again using 30mm black screws 44x30mm Black Screws Pre drill hole 30mm screw 20 19 19 Step 3 Fix the door beading strips to the door gable using 4x30mm screws for each strip M...

Page 4: ...e the building to the floor until the roof is fixed 6x50mm Screws a b Pre drill hole 50mm screw Step 8 Following the same method outlined in step 6 attach the door gable the remaining window side onto...

Page 5: ...ing with 10x30mm screws Repeat this process with the next two roof panels 20x30mm Screws Pre drill hole 30mm screw Step 11 Locate the roof panels on to the gables making sure the roofs sit inbetween t...

Page 6: ...rews per side 14x50mm Screws Pre drill hole 50mm screw Step 15 Fix the cover trims to each corner of the building and across the panel joints on each side securing the trims in place with 18x30mm scre...

Page 7: ...m screw Pre drill hole Pre drill hole Pre drill hole Step 18 Place the cover strip 13mm above the gap in the window panel and fix into place using 3x30mm screws 6x30mm Screws If you would like the wid...

Page 8: ...0mm screws Ensure the key hole lines up with the lock and the mechanism can be opened and closed without restriction 4x30mm Screws Pre drill hole 30mm screw Step 22 Secure the handle to the master doo...

Page 9: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instruct...

Reviews: