P 3
Fix the panels onto the base using
4 x 50mm screws per panel.
Fix the corners with 50mm screws
as shown in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
Step 2
7x50mm Screws
50mm
screw
Step 3
Fix the remaining window
panel at the corner using
3 x 50mm screws.
Screw to the base using
4 x 50mm screws per panel.
Step 4
Fix the door sides to the window
panels and to the base using
10x50mm screws.
Please retain product label and instructions for future reference
Pre drill
hole
50mm
screw
11 x 50mm screws
2
3
Pre drill
hole
50mm
screw
10x50mm Screws
Pre drill
hole
50mm
screw
Step 5
Fix the gable tops to the panels
using 4x50mm screws per top as
shown in the diagram.
8x50mm Screws
Pre drill
hole
50mm
screw
2
1
1
5
b
b
b
b
b
b
b
4