background image

P 3

 
 

Fix the panels onto the base using
4 x 50mm screws per panel. 

Fix the corners with 50mm screws 
as shown in diagram.

Position the panels so there is equal spacing 
between the floor and cladding on all 4 sides

Step 2

7x50mm Screws

50mm 

screw

Step 3

Fix the remaining window
panel at the corner using
3 x 50mm screws.

Screw to the base using
4 x 50mm screws per panel.

 

Step 4

Fix the door sides to the window 

panels and to the base using 

10x50mm screws.

Please retain product label and instructions for future reference

             

Pre drill 

hole

50mm 

screw

11 x 50mm screws

2

3

Pre drill 

hole

50mm 

screw

10x50mm Screws

Pre drill 

hole

50mm 

screw

Step 5

Fix the gable tops to the panels 

using 4x50mm screws per top as 

shown in the diagram.

8x50mm Screws

Pre drill 

hole

50mm 

screw

2

1

1

5

b

b

b

b

b

b

b

4

Reviews: