background image

P 6

Please retain product label and instructions for future reference

             

Please retain product label and instructions for future reference

             

Step 12

 

To fix Shelf B 

(No. 7)

 into position, attach 

Butt hinges 

(No. 20)

 to the underside of 

the horizontal framing with 3x30mm 

screws per hinge as shown.

Fix the shelf to the hinges with 3x 30mm 

screws per hinge. 

To allow for the shelf to be horizontal, fix 

the Tower bolts 

(No. 18)

 to the front of 

the shelf with 4x30mm screws per Tower 

bolt.

 

To allow for the tower bolt to be locked, 

drill a hole into Shelf A.

14x30mm screws. 

Lower view

Upper view

Step 13

 

Fix the Static Roof 

(No. 5)

 into postion 

with 4x60mm screws at the rear and 

4x40mm at the front.

*Make sure the side of the Roof panel is 

flush with the side of the building. 

  

4x40mm screws.

4x60mm screws. 

Step 14

 

To fix the opening Roof 

(No. 5)

, place in 

postion so it aligns with the fixed Roof.

*Make sure the side of the Roof panel is 

flush with the side of the building. 

Once in position, fix in place with two 

Butterfly hinges 

(No. 21)

.

 

Fix to the 

building first with 4x40mm screws per 

hinge and then to the Roof with 4x30mm 

screws. 

  

8x30mm screws.

8x40mm screws. 

Pre drill 

hole

30mm 

screw

Pre drill 

hole

40mm 

screw

60mm 

screw

Pre drill 

hole

40mm 

screw

30mm 

screw

19

7

5

21

21

20

Summary of Contents for 04VCGRO-V2

Page 1: ...d periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden buildi...

Page 2: ...Door AI 04VCGROD410X1640 V2 QTY 4 Roof AI 04VCGROR876X860 V2 QTY 2 Shelf A AI 04VCGROSHA440X715 V2 QTY 2 Shelf B AI 04VCGROSHB275X821 V2 Framing 27x44x1642mm QTY 3 F2744 1642mm Strip 7x27x410mm QTY 2 S727 410mm Cover trim 12x56x1840mm QTY 2 S1256 1840mm Cover trim 12x56x1713mm QTY 2 S1256 1713mm Door trim 12x56x1595mm QTY 1 S1256 1595mm 2 1 3 4 5 6 7 21 8 9 11 12 13 14 15 17 18 19 20 10 Roof trim ...

Page 3: ... 60mm screw Step 2 Position the Left Side Panel No 1 next to the Back panel No 2 as shown and secure with 3x40mm screws Do NOT secure to the base framing until the Roof is fitted 3x40mm screws Pre drill hole 40mm screw Step 3 Fix the second Back panel No 2 side by side to the existing Back panel as shown with 3x40mm screws Position the Right Side Panel No 3 to next to the Back panel No 2 as previo...

Page 4: ... of the framing 8x40mm screws 8x60mm screws Step 4 In order for the static doors to be fixed in position Fix the Strips No 9 to two of the doors as shown with 2x30mm screws per door 4x30mm screws Pre drill hole 60mm screw Pre drill hole 30mm screw Step 6 Place the Static Door frame in postion and fix with 60mm screws securing from the outside as shown Do NOT secure to the base framing until the Ro...

Page 5: ...or second shelf 8x20mm screws Step 10 Attach the Butterfly hinges No 21 to the Doors No 4 using 4x30mm screws per hinge as shown Fix the Doors to the building as shown using 4x30mm screws 16x30mm screws Pre drill hole 20mm screw Step 11 Once the Doors are fitted Determine which door is to be the Master door and attach 2xTurn buttons No 18 to the outside of the door with 2x30mm black screws so that...

Page 6: ...le into Shelf A 14x30mm screws Lower view Upper view Step 13 Fix the Static Roof No 5 into postion with 4x60mm screws at the rear and 4x40mm at the front Make sure the side of the Roof panel is flush with the side of the building 4x40mm screws 4x60mm screws Step 14 To fix the opening Roof No 5 place in postion so it aligns with the fixed Roof Make sure the side of the Roof panel is flush with the ...

Page 7: ...ws 6x30mm screws 3x40mm screws Step 16 Fix the Cover trims No 10 No 11 as shown with 3x30mm screws per trim 12x30mm screws Step 17 Fix the Roof support block No 16 to the inside of the side panel with 1x50mm screw This block allows for the Opening Roof to be kept open as shown 1x50mm screws Step 18 Fix the building to the base with 50mm screws evenly spaced as shown 18x50mm screws Pre drill hole 4...

Page 8: ...pply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instructions for future reference P8 ...

Reviews: