Step 3

Parts Needed - No. 5 QTY 12

                                 No. 8 QTY 6

                                 No. 10 QTY 10

 

Following the same method

outlined in 

Pre-Assembly

, lay

the first 6 boards (No’s. 5, 8 & 

10) onto the starter boards to 

create your first level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

P 5

Please retain product label and instructions for future reference

             

10

10

8

5

5

10

8

11

6

7

6

7

Step 5

Parts Needed - No. 6 QTY 12

                                 No. 7 QTY 12

                                 No. 8 QTY 6

                                 No. 10 QTY 6

                                 No. 11 QTY 12

Following the same method

outlined in 

Pre-Assembly

, lay

the next 6 boards (No’s. 6, 7, 

8, 10 & 11) onto the assembly

 to create your second 

level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

*Doors can be hung once the 

boarding has enclosed the 

door frame by 12-13 boards, 

refer to door installation 

instructions, if not, you can 

install the door at step 7.

Step 4

Once you have laid 6 log boards (

off 

of the starter

) up the door section, 

slide the assembled door frame (No. 

2) over the boards resting the frame 

on top of the starter board.

*Please note:

 This image is for illustra-

tive purposes and may differ from 

your choice in product (

regarding 

door position

). Nevertheless the 

process of fitting the door frame is 

the same.

**Please Note: 

The short boards at 

the

front of the building (either side of 

the door and window opening’s) can 

be placed either side depending on 

your needs.

11

Summary of Contents for 0619LOG015-V4

Page 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be const...

Page 2: ...rd 50x19x4000mm QTY 2 LB19RG50 A 4000 Log Board 120x19x2996mm QTY 25 LB19 A 2996 Log Board 120x19x1123mm QTY 24 LB19 B 1123 Roof Purlin 40x90x4004mm QTY 3 F4090 4004 Bearer 44x44x3720mm QTY 10 F4444 3...

Page 3: ...PI 07 0208 20x100x2mm 25 Felt Tacks x400 70mm Screw x64 Nail Bag 40mm Screw x524 30mm Screw x84 60mm Bolt Set x16 Pre assembly Please note Each board interlocks at either end in a staggered pattern Be...

Page 4: ...14 14 14 14 14 14 14 IMPORTANT Pre drill before fixing screws Pre drill hole 70mm screw a Step 1 Parts Needed No 14 QTY 10 No 15 QTY 2 Lay the bearers No s 14 15 onto a firm and level surface free fro...

Page 5: ...r second level Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame by 12 13 boards refer to door installation...

Page 6: ...are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame Step 8 Parts Needed No 8 QTY 1 No 10 QTY 1 No 22 QTY 1 No 23 QTY 1 Following th...

Page 7: ...rts needed No 13 QTY 3 Align the Roof Purlin s No 13 into the cut out slots on each gable top ensuring each roof purlin interlocks the boards Secure the roof purlins at each end by screwing through th...

Page 8: ...op of the apex The last board on each side will overhang Using a straight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down boards back on...

Page 9: ...gh each of the floor boards into the floor bearers 272x40mm Screws 40mm screw Pre drill hole Cut to fit Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space 23 23 Closu...

Page 10: ...ging felt each side Once the felt is laid out fix to the roof using felt tacks at 100mm intervals Felt size 4124mm 252x Felt Tacks 1 2 3 4 5 Step 18 Parts Needed No 16 QTY 4 No 17 QTY 2 Align the fasc...

Page 11: ...1 around the building internally Place 2x storm braces per side fixing into place using 2x 60mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the sto...