background image

P 5

Please retain product label and instructions for future reference

             

9

5

6

6

5

10

7

Step 3

Parts Needed - No. 5 QTY 12

                                 No. 6 QTY 12

                                 No. 7 QTY 6

                                 No. 9 QTY 5

                                 No. 10 QTY 10

 

Following the same method

outlined in 

Pre-Assembly

, lay

the first 6 boards (

No’s. 5, 6, 

7, 9 &10

) onto the starter 

boards to create your first level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

*Doors can be hung once the

 boarding has enclosed the door

 frame by 6 boards, refer to

 door installation instructions, if

 not, you can install the door at 

step 5.

Step 4

Once you have laid 6 log boards (

off of 

the starter

) up the door section, slide the 

assembled door frame (

No. 1

) and 

windows (

No. 2

) over the boards resting 

the frame on top of the starter boards. 

Please see instructions provided with 

your doors and windows to assemble.

*Please note:

 This image is for illustrative 

purposes and may differ from your 

choice in product (

regarding door/win-

dow position

). Nevertheless the process 

of fitting the door frame is the same.

9

5

5

10

10

Step 5

Parts Needed - No. 5 QTY 24

                                 No. 6 QTY 24

                                 No. 7 QTY 12

                                 No. 9 QTY 12

                                 No. 10 QTY 24

Following the same method

outlined in 

Pre-Assembly

, lay

the next boards (

No’s. 5, 6, 

7, 9 & 10

) onto the assembly

until you reach the top of the 

door panels. 

*Ensure that the boards are

level and flush with each

other as you lay each one.

*Doors can be hung once the 

boarding has enclosed the 

door frame.

10

7

6

6

Summary of Contents for 0619LOG018-V4

Page 1: ...or building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are goi...

Page 2: ...45x19x3500mm QTY 2 LB19RG45 A 3500 Log Board 120x19x2996mm QTY 20 LB19 A 2996 Log Board 120x19x1123mm QTY 36 LB19 B 1123 Roof Purlin 90x40x3504mm QTY 3 F4090 A 3504 Eaves Frame 27x44x3500mm QTY 2 F27...

Page 3: ...re assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Felt Tacks x200 70...

Page 4: ...the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the fram...

Page 5: ...ter up the door section slide the assembled door frame No 1 and windows No 2 over the boards resting the frame on top of the starter boards Please see instructions provided with your doors and windows...

Page 6: ...evel and flush with each other as you lay each one 4x70mm Screws Pre drill hole 70mm screw Step 6 Parts Needed No 3a QTY 1 No 3b QTY 1 No 7 QTY 1 No 21 QTY 1 Place the last two log boards No s 7 21 on...

Page 7: ...the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Ensure the roof boards meet at the top of the apex and leave an over hang at the bottom Due t...

Page 8: ...e log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Following the...

Page 9: ...eded No 20 QTY 8 Inside the building place the closure trim No 20 against the boarding and align with the roof as shown in the illustration ensuring the angled face follows the roof line Once in posit...

Page 10: ...40mm Screws Pre drill hole 40mm screw 13 14 13 14 13 13 14 IMPORTANT Pre drill before fixing screws Pre drill hole 60mm bolt Step 16 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the...

Reviews: