P 9
Please retain product label and instructions for future reference
Felt
tacks
Step 14
Parts needed - No. 22
Cut the felt into five strips and lay
onto the roof in the order shown
in the illustration.
*Ensure there is approximately 50mm
of overhanging felt each side.
Once the felt is laid out fix to the
roof using felt tacks at 100mm
intervals.
*Felt size: 3624mm
170x Felt Tacks
Closure Trim
Internal
23
*Measure and cut the
closure trims to
fit the internal space.
23
23
Closure Trim
Internal
20
*Measure and cut the
closure trims to
fit the internal space.
20
20
Pre drill
hole
30mm
screw
*
trim to fit
Step 12
Parts needed - No. 20 QTY 8
Inside the building place the closure
trim (
No. 20
) against the boarding
and align with the roof as shown in
the illustration, ensuring the angled
face follows the roof line.
Once in position fix each trim
into place by pre drilling a pilot hole
and using 6x30mm screws per trim,
equally spacing them along the face
of the board.
48x30mm Screws
30mm
screw
Pre drill
hole
*
Cut to fit
Step 13
Parts needed - No. 20 QTY 8
Once the floor has been laid arrange the
closure trim (
No. 20)
around the outside
edge of floor (
internally
), measure and cut
down accordingly to best match the
internal space.
Secure each trim section into place using
6x30mm spaced equally along the board
as shown in the illustration.
*Do NOT fix the closure trim to the floor-
boards.
48x30mm Screws
Roof
Roof
HANDLE
WITH CARE
1
2
3
4
1.
2.
3.
4.
5.