background image

P 9

Please retain product label and instructions for future reference

Felt 

tacks 

Step 14

Parts needed - No. 22 

Cut the felt into five strips and lay 

onto the roof in the order shown 

in the illustration.

*Ensure there is approximately 50mm

of overhanging felt each side.

Once the felt is laid out fix to the 

roof using felt tacks at 100mm

intervals.

*Felt size: 3624mm

170x Felt Tacks

Closure Trim

Internal

23

*Measure and cut the

closure trims to

fit the internal space.

23

23

Closure Trim

Internal

20

*Measure and cut the

closure trims to

fit the internal space.

20

20

Pre drill 

hole

30mm 

screw

*

trim to fit

Step 12

Parts needed - No. 20 QTY 8 

   

 

Inside the building place the closure 

trim (

No. 20

) against the boarding 

and align with the roof as shown in 

the illustration, ensuring the angled 

face follows the roof line. 

Once in position fix each trim 

into place by pre drilling a pilot hole 

and using 6x30mm screws per trim, 

equally spacing them along the face 

of the board.

48x30mm Screws

30mm 

screw

Pre drill 

hole

*

Cut to fit

Step 13

Parts needed - No. 20 QTY 8

Once the floor has been laid arrange the

closure trim (

No. 20)

 around the outside 

edge of floor (

internally

), measure and cut 

down accordingly to best match the 

internal space.

Secure each trim section into place using 

6x30mm spaced equally along the board 

as shown in the illustration.

*Do NOT fix the closure trim to the floor-

boards.

48x30mm Screws

 

Roof

Roof

HANDLE

WITH CARE

1

2

3

4

1.

2.

3.

4.

5.

Summary of Contents for 0619LOG018-V4

Page 1: ...or building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are goi...

Page 2: ...45x19x3500mm QTY 2 LB19RG45 A 3500 Log Board 120x19x2996mm QTY 20 LB19 A 2996 Log Board 120x19x1123mm QTY 36 LB19 B 1123 Roof Purlin 90x40x3504mm QTY 3 F4090 A 3504 Eaves Frame 27x44x3500mm QTY 2 F27...

Page 3: ...re assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Felt Tacks x200 70...

Page 4: ...the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the fram...

Page 5: ...ter up the door section slide the assembled door frame No 1 and windows No 2 over the boards resting the frame on top of the starter boards Please see instructions provided with your doors and windows...

Page 6: ...evel and flush with each other as you lay each one 4x70mm Screws Pre drill hole 70mm screw Step 6 Parts Needed No 3a QTY 1 No 3b QTY 1 No 7 QTY 1 No 21 QTY 1 Place the last two log boards No s 7 21 on...

Page 7: ...the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Ensure the roof boards meet at the top of the apex and leave an over hang at the bottom Due t...

Page 8: ...e log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Following the...

Page 9: ...eded No 20 QTY 8 Inside the building place the closure trim No 20 against the boarding and align with the roof as shown in the illustration ensuring the angled face follows the roof line Once in posit...

Page 10: ...40mm Screws Pre drill hole 40mm screw 13 14 13 14 13 13 14 IMPORTANT Pre drill before fixing screws Pre drill hole 60mm bolt Step 16 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the...

Reviews: