P 5
Please retain product label and instructions for future reference
Step 4
Parts Needed - No. 3 QTY 25
Place the Floor Boards (No. 3)
onto the bearers and secure each
board into place using 3x40mm
screws, ensuring to screw
through the boards into the bear-
ers below.
75x40mm Screws
40mm
screw
Pre drill
hole
3
Step 5
Parts Needed - No. 9 QTY 2
Fix the last two log boards (No.9)
onto the veranda sides using
1x70mm screws per board through
the notches and 2x40mm screws
per board through the boards as
shown in the illustration.
2x40mm Screws
2x70mm Screws
70mm
screw
Pre drill
hole
40mm
screw
9
9
9
Rubber Mallet
may be required
to fit parts.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
SILICONE
SEALANT
It is ESSENTIAL to seal around all window framing with
sillicone sealant (not included) to minimise water ingress.