Pre drill 

hole

70mm 

screw

Pre drill 

hole

70mm 

screw

Pre drill 

hole

IMPORTANT : 

Pre-drill before fixing screws.

Example picture 

2 screws per bearer per end.

P 4

Please retain product label and instructions for future reference

13

Step 1

Parts needed - No. 13 QTY 2

 

 

   No. 14 QTY 2

Lay the starters 

(No. 13 & No. 14)

 

onto a firm and level surface 

(free from areas where standing 

water can collect)

 as shown in the 

illustration.

Fix the framing together at each 

corner using 8x70mm screws, 

ensuring the frame is flush.

8x70mm Screws 

Step 2

Parts needed - No. 14 QTY 7

Following the same method, 

arrange the remaining framing 

(No. 14)

 as shown in the 

illustration.

*Ensure there is an equal

amount of space between each

frame.

Secure each of the frames in 

place using 2x70mm screws 

for each side of the bearer, 

ensuring the framing remains 

level.

28x70mm Screws 

70mm 

screw

Step 3 

Parts needed - No. 4 QTY 2

 

 

 No. 8 QTY 2

Place the starter boards (No’s.

 4 & 8) on to assembled base 

frame along the longest sides.

*Ensure the notches at either 

end of each board are flush 

and level with the ends of the 

frame.

Fix each of the starter boards to

the frame by screwing through

the notch into the frame as 

shown in the illustration.

4x70mm Screws 

14

13

14

13

14

14

14

14

14

14

14

14

14

8

4

8

4

IMPORTANT: 

Pre-drill before fixing screws.

IMPORTANT : 

Pre-drill before fixing screws.

4

Summary of Contents for 0628LOG114-V4

Page 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constr...

Page 2: ...x120x4000mm QTY 19 LB28 A 4000 Log Board 28x120x3396mm QTY 2 LB28 AE 3396 11 Log Board WA 28x120x3896mm QTY 2 LB28 AE 3896 12 Log Board WA 28x120x4396mm QTY 2 LB28 AE 4396 13 Bearer 44x44x2804mm QTY 2...

Page 3: ...ered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x600 70...

Page 4: ...method arrange the remaining framing No 14 as shown in the illustration Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side...

Page 5: ...No 9 QTY 6 Lay the next 6 boards No s 5 6 8 9 onto the assembly to create your second level Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the b...

Page 6: ...st two boards No s 9 22 onto the front of the assembly Once in position place log board No 12 onto the plain sides fixing into position by screwing through the notches as shown in the illustration Ens...

Page 7: ...Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You maybe required to use the provided spacers and place a space of 2mm to ensure every ro...

Page 8: ...l Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Measure the gap between the bottom...

Page 9: ...al space 21 21 Pre drill hole 30mm screw trim to fit Step 15 Parts needed No 21 QTY 6 Inside the building place the closure trim No 21 against the boarding and align with the roof as shown in the illu...

Page 10: ...ole 40mm screw Step 19 Parts needed No 20 QTY 8 Arrange the storm braces No 20 around the building internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure...