background image

P 8

Please retain product label and instructions for future reference

19

Step 13

Parts needed - No.17 QTY 4

Ensuring the roof boards are flush

at the overhanging side and meet

at the apex, fix the eaves frames 

(No. 17)

 to the underside of the roof

boards using 9x40mm screws as 

shown in the illustration

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in 

product. Nevertheless the process 

of fixing the eaves frames is the

same.

36x40mm Screws 

40mm 

screw

Pre drill 

hole

Step 14

Parts needed - No.19 QTY 34

Place the first floor board 

(No. 19)

inside the building flush to the log

board on the wall. Continue adding

the floor boards 

(internally)

 making

sure to interlock each individual

board.

*Do 

NOT

 secure the boards until

the last board has been measured

and cut.

Measure the gap between the

bottom of the tongue 

(on the last 

board placed)

 and the log board.

Using a straight edge mark out the 

measurement onto the last floor

board 

(No. 19)

 and cut along the 

length removing the excess.

**Please note:

  Mark the final board

2mm under the measurement; This

will allow the timber to expand and

contract correctly.

Once all the floor boards are in 

position secure each board into

position using 8x40mm screws.

***Please Note:

  Ensure to screw 

through each of the floor boards 

into the floor bearers.

272x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

IMPORTANT : 

Pre-drill before fixing screws.

IMPORTANT: 

Pre-drill before fixing screws.

28

18

Summary of Contents for 0628LOG114-V4

Page 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constr...

Page 2: ...x120x4000mm QTY 19 LB28 A 4000 Log Board 28x120x3396mm QTY 2 LB28 AE 3396 11 Log Board WA 28x120x3896mm QTY 2 LB28 AE 3896 12 Log Board WA 28x120x4396mm QTY 2 LB28 AE 4396 13 Bearer 44x44x2804mm QTY 2...

Page 3: ...ered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x600 70...

Page 4: ...method arrange the remaining framing No 14 as shown in the illustration Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side...

Page 5: ...No 9 QTY 6 Lay the next 6 boards No s 5 6 8 9 onto the assembly to create your second level Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the b...

Page 6: ...st two boards No s 9 22 onto the front of the assembly Once in position place log board No 12 onto the plain sides fixing into position by screwing through the notches as shown in the illustration Ens...

Page 7: ...Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You maybe required to use the provided spacers and place a space of 2mm to ensure every ro...

Page 8: ...l Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Measure the gap between the bottom...

Page 9: ...al space 21 21 Pre drill hole 30mm screw trim to fit Step 15 Parts needed No 21 QTY 6 Inside the building place the closure trim No 21 against the boarding and align with the roof as shown in the illu...

Page 10: ...ole 40mm screw Step 19 Parts needed No 20 QTY 8 Arrange the storm braces No 20 around the building internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure...

Reviews: