a
b
P 10
Please retain product label and instructions for future reference
Pre drill
hole
Step 18
Parts needed - No. 23 QTY 2
No. 24 QTY 1
Align the roof purlin(
s
) (
No. 23
)
into the cut out slots on each gable top at
the rear of the building ensuring each
roof purlin interlocks the boards.
Following the
same outlined method place the
remaining roof purlin (
No. 24
-
3x notches
)
into cut out slots at the front of the
building ensuring the roof purlin
interlocks the boards.
Secure the purlin at each end by
screwing through the bars into the
boards (
ensure to pre-drill to avoid
the boards splitting
) using 4x70mm
screws per purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ
in width from your choice in product.
Nevertheless, despite any differences
the process of fixing the purlins
is the same.
12x70mm Screws
70mm
screw
23
16
15
Step 17
(See Pre-Assembly)
Parts needed - No. 15 QTY 1
No. 16 QTY 1
Place the log boards (
No’s.
15 & 16
) onto the front and
rear of the building securing
the boards in to place using
5x70mm as shown in the
illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
**Ensure to stagger the screws
to ensure not to collide.
2x70mm Screws
Pre drill
hole
70mm
screw
23
23
24
Rear
Front
IMPORTANT:
Pre-drill before fixing screws.
a
b
IMPORTANT:
Pre-drill before fixing screws.