Please retain product label and instructions for future reference

HANDLE

WITH CARE

1

2

3

4

Felt 

tacks 

Step 25

Parts needed - No. 38 QTY 1

Cut the felt (No. 38) into five strips 

and lay onto the roof in the order 

shown in the illustration.

*Ensure there is approximately 

50mm of overhanging felt each 

side.

Once the felt is laid out fix to the 

roof using felt tacks at 100mm

intervals.

*Felt size: 4130mm

1.

2.

3.

4.

5.

Step 26

Parts needed - No. 26 QTY 4

Align the fascia’s (

No. 26

)

with the roof and fix into

place using 3x40mm

screws per fascia, making

to screw through the 

fascia into the roof purlins

and eaves frame..

*Ensure the angled cuts meet

at the top of the apex.

12x40mm Screws

Pre drill 

hole

40mm 

screw

26

26

26

26

27

27

32

27

Step 27

Parts needed - No. 27 QTY 2

Fix the two larger fascia’s 

(

No. 27

) to the front and

rear of the building, 

securing each fascia into

place using 10x40mm

screws per fascia.

*Ensure to screw through

the fascia into the eaves

frames.

20x40mm Screws

Pre drill 

hole

40mm 

screw

38

Summary of Contents for 0628LOG131-V4

Page 1: ...ilding is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to...

Page 2: ...B28RT66 A 4000 Starter Board 28x66x2220mm LB28RT66 A 2220 Starter Board 28x66x2000mm LB28RT66 A 2000 Log Board 28x120x2111mm QTY 6 LB28 A 2111 Log Board 28x120x2000mm QTY 6 LB28 A 2000 Log Board 28x12...

Page 3: ...for future reference Veranda Post 70x70x2001mm F7070 2001 Notched Fascia 16x120x1601mm QTY 4 S16120 1601 Angled Fascia 16x120x4036mm QTY 2 S16120 4036 Eaves Frame 27x44x4000mm QTY 2 F2744 4000 Roof B...

Page 4: ...ds No 6 7 8 9 11 22 on to the assembled base frame along the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards...

Page 5: ...ards at the front of the building either side of the door and window opening s can be placed either side depending on your needs 9 22 11 19 13 10 19 Step 4 Once you have laid 6 log boards off of the s...

Page 6: ...boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame Please Note The short boards placed to create the opening s for the doors...

Page 7: ...Screws Step 7 See Pre Assembly Parts needed No 11 QTY 6 No 13 QTY 6 No 17 QTY 12 No 18 QTY 12 No 19 QTY 12 No 22 QTY 6 Following the same method outlined in Pre Assembly lay the remaining boards No s...

Page 8: ...12 22 onto the assembly as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one Fix each board to the one below using 1x70mm screw per side Fix the...

Page 9: ...gger the screws to ensure not to collide 4x70mm Screws Pre drill hole 70mm screw 21 Step 15 See Pre Assembly Parts needed No 21 QTY 1 Keep adding the remaining boards onto the front and gables followi...

Page 10: ...the boards splitting using 4x70mm screws per purlin Please note The gable shown is for illustrative purposes and may differ in width from your choice in product Nevertheless despite any differences th...

Page 11: ...the apex The last board on each side will overhang Using a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto th...

Page 12: ...d 1mm under the measurement This will allow the timber to expand and contract correctly Once all the floor boards are in position secure each board into position using 8x40mm screws Please Note Ensure...

Page 13: ...position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 42x30mm Screws 30mm screw Pre drill hole Cut to fit Ste...

Page 14: ...mm 1 2 3 4 5 Step 26 Parts needed No 26 QTY 4 Align the fascia s No 26 with the roof and fix into place using 3x40mm screws per fascia making to screw through the fascia into the roof purlins and eave...

Page 15: ...internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are secured...

Reviews: