background image

P 5

Please retain product label and instructions for future reference

IMPORTANT: 

Pre-drill before fixing screws.

Step 3 

(See Pre-Assembly)

Parts needed - No. 9 QTY 5

 

 

No. 10 QTY 6

 

 

No. 11 QTY 5

 

 

No. 13 QTY 6

 

 

No. 19 QTY 12

 

 

No. 22 QTY 5

Following the same method

outlined in 

Pre-Assembly

, lay

the first 6 boards (

No’s. 9, 10,

11, 13, 19 & 22

) onto the 

starter boards to create your 

first level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

 

Please Note: 

The short boards at the

front of the building (either side of

the door and window opening’s)

can be placed either side depending

on your needs.

9

22

11

19

13

10

19

Step 4

Once you have laid 6 log boards (

off 

of the starter

) up the door section, 

slide the assembled door frame 

(No. 

2)

 assembly over the boards resting 

the frame on top of the starter board.

*Please note:

 This image is for illustra -

tive purposes and may differ from 

your choice in product (

regarding 

door position

). Nevertheless the 

process of fitting the door frame is 

the same.

**Please Note: 

The short boards at 

the

front of the building (either side of 

the door and window opening’s) can 

be placed either side depending on 

your needs.

Summary of Contents for 0628LOG131-V4

Page 1: ...ilding is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to...

Page 2: ...B28RT66 A 4000 Starter Board 28x66x2220mm LB28RT66 A 2220 Starter Board 28x66x2000mm LB28RT66 A 2000 Log Board 28x120x2111mm QTY 6 LB28 A 2111 Log Board 28x120x2000mm QTY 6 LB28 A 2000 Log Board 28x12...

Page 3: ...for future reference Veranda Post 70x70x2001mm F7070 2001 Notched Fascia 16x120x1601mm QTY 4 S16120 1601 Angled Fascia 16x120x4036mm QTY 2 S16120 4036 Eaves Frame 27x44x4000mm QTY 2 F2744 4000 Roof B...

Page 4: ...ds No 6 7 8 9 11 22 on to the assembled base frame along the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards...

Page 5: ...ards at the front of the building either side of the door and window opening s can be placed either side depending on your needs 9 22 11 19 13 10 19 Step 4 Once you have laid 6 log boards off of the s...

Page 6: ...boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame Please Note The short boards placed to create the opening s for the doors...

Page 7: ...Screws Step 7 See Pre Assembly Parts needed No 11 QTY 6 No 13 QTY 6 No 17 QTY 12 No 18 QTY 12 No 19 QTY 12 No 22 QTY 6 Following the same method outlined in Pre Assembly lay the remaining boards No s...

Page 8: ...12 22 onto the assembly as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one Fix each board to the one below using 1x70mm screw per side Fix the...

Page 9: ...gger the screws to ensure not to collide 4x70mm Screws Pre drill hole 70mm screw 21 Step 15 See Pre Assembly Parts needed No 21 QTY 1 Keep adding the remaining boards onto the front and gables followi...

Page 10: ...the boards splitting using 4x70mm screws per purlin Please note The gable shown is for illustrative purposes and may differ in width from your choice in product Nevertheless despite any differences th...

Page 11: ...the apex The last board on each side will overhang Using a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto th...

Page 12: ...d 1mm under the measurement This will allow the timber to expand and contract correctly Once all the floor boards are in position secure each board into position using 8x40mm screws Please Note Ensure...

Page 13: ...position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 42x30mm Screws 30mm screw Pre drill hole Cut to fit Ste...

Page 14: ...mm 1 2 3 4 5 Step 26 Parts needed No 26 QTY 4 Align the fascia s No 26 with the roof and fix into place using 3x40mm screws per fascia making to screw through the fascia into the roof purlins and eave...

Page 15: ...internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are secured...

Reviews: