P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
17
15
16
15
17
16
16
a
Pre drill
hole
70mm
screw
Step 1
Parts needed - No. 16 QTY 13
No. 17 QTY 2
Lay the bearers (
No’s 16 &
17
) onto a firm and level surface
(
free from areas where standing
water can collect
) as shown in
the illustration.
Fix the framing together at each
corner using 8x70mm screws,
ensuring the frame is flush.
8x70mm Screws
Pre drill
hole
70mm
screw
Following the same
method arrange the
remaining framing (
No. 15
)
inside the assembled frame.
*Ensure there is an equal
amount of space between
each frame.
Secure each of the frames in
place using 2x70mm screws
for each side of the bearer,
ensuring the framing remains
level.
44x70mm Screws
b
15
a
b
Pre drill
hole
70mm
screw
Step 2
Parts needed- No. 16 QTY 13
No. 17 QTY 2
Repeat Steps 1 & 2 to create the
second base section.
*Ensure there is an equal
amount of space between each
frame.
Once built secure both base
sections together using 70mm
screws as shown in the
illustration, ensuring to screw
in an alternating pattern so as
not to collide.
76x70mm Screws
Example picture
2 screws per bearer per end.