background image

P 9

Please retain product label and instructions for future reference

             

14

Step 12

Parts needed - No. 14 QTY 90  

 

Place the first two roof 

boards (No. 14) onto the assembly 

on each side, making sure the 

boards are flush to the end of the 

roof purlin. Once in position fix to 

each purlin using 3x40mm screws.

Due to natural occurences of wood 

shrinkage / expansion. You maybe 

required to use the provided spac-

ers and place a space of 2mm to 

ensure every roof board lines up 

with the truss’.

*Ensure the roof boards meet

at the top of the apex and leave

an overhang at the bottom.

Continue adding the roof boards

along the roof, fixing each one into

position using 3x40mm screws,

making sure that each board is 

interlocked, flush at the bottom &

meet at the top of the apex.

 

The last board on each side 

will overhang: Using a staight edge

and a pencil mark out a line as 

a guide. 

Cut along the pencil mark and

remove the excess. Place the

cut down boards back onto the

roof and secure into place

using 3x40mm screws per

board.

*Please Note: 

This image is for 

illustrative purposes and may differ 

from your choice in product. 

Nevertheless the process of cutting 

and fitting the last roof boards is the 

same.

270x40mm Screws 

40mm 

screw

Pre drill 

hole

*Cut to fit

23b

14

14

28

19

19

19

Step 13

Parts needed - No. 19 QTY 4 

Ensuring the roof boards are 

flush at the overhanging side and 

meet at the apex, fix the Eaves 

Frames (No. 19) to the underside 

of the roof boards using 9x40mm 

screws as shown in the 

illustration.

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in product. 

Nevertheless the process of fixing 

the eaves frames is the same.

36x40mm Screws 

40mm 

screw

Pre drill 

hole

a

b

a

b

Summary of Contents for 0634LOG249-V4

Page 1: ...r during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during...

Page 2: ...893mm QTY 12 LB34 C 893 Log Board 34x120x1625mm QTY 24 LB34 B 1625 Log Board 34x120x5000mm QTY 19 LB34 A 5000 Log Board 34x45x5000mm QTY 2 LB34RG45 A 5000 Roof Board 16x121x2114mm QTY 90 MB16 C 2114 F...

Page 3: ...ered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x600 70...

Page 4: ...wing the same method arrange the remaining framing No 17 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws f...

Page 5: ...t level Ensure that the boards are level and flush with each other as you lay each one IMPORTANT Pre drill before fixing screws Step 4 Once you have laid 6 log boards off of the starter up the door se...

Page 6: ...e by 12 13 boards refer to door installation instructions if not you can install the door at step 7 Please Note The short boards placed to create the opening s for the doors windows can be placed eith...

Page 7: ...he door frame IMPORTANT Pre drill before fixing screws 3 3 Step 8 See Pre Assembly Parts needed No 5 QTY 1 No 10 QTY 1 No 12 QTY 1 No 13 QTY 1 Following the same method outlined in Pre Assembly lay th...

Page 8: ...11 IMPORTANT Pre drill before fixing screws IMPORTANT Pre drill before fixing screws Pre drill hole Step 11 Parts needed No 18 QTY 3 Align the Roof Purlin s No 18 into the cut out slots on each gable...

Page 9: ...he apex The last board on each side will overhang Using a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down boards back onto the r...

Page 10: ...ough each of the floor boards into the floor bearers 344x40mm Screws 40mm screw Pre drill hole Cut to fit Roof Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space 23 2...

Page 11: ...per fascia making sure to screw through the fascia into the roof purlins and eaves frame Ensure the angled cuts meet at the top of the apex 24x40mm Screws Pre drill hole 40mm screw Pre drill hole 80mm...

Page 12: ...It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled P 12 Please retain product label and instructions for future reference...

Reviews: