background image

P8

Please retain product label and instructions for future reference

             

Step 20

 

Fix the Window Crosses 

(No. 16 & No. 17)

 

into the windows securing with 6x20mm 

screws. 

Further secure the crosses with 10mm at 

each meeting point.

12x20mm screws. 

6x10mm screws.

Pre drill 

hole

10mm 

screw

Step 19

 

Fix the Turn Buttons 

(No. 21)

 to the top of 

each  door with 1x20mm black screw per 

Button.

2x20mm black screws. 

Pre drill 

hole

20mm 

screw

21

17

16

16

20mm 

screw

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

It is ESSENTIAL that you apply wood treat

-

ment immediately after the building has 

been assembled.

Summary of Contents for Wessex 03WES0808-V3

Page 1: ...but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pre...

Page 2: ...20mm angled x2 Cover Strips 1694mm S1240 1694mm x4 Window Cross A 500mm WC1627 500mm x6 Window Cross B 1094mm WC1627 1094mm x3 Press Lock PI 07 0018 2x Ring Pull PI 07 0032 6x Hinge PI 07 0004 2x Turn...

Page 3: ...2 and Plain Panel No 4 onto the Floor Secure the Panels together with 3x50mm screws as shown Do not fix to the Floor until the Roof is fiitted 3x50mm screws Pre drill hole 50mm screw Step 3 Fix the W...

Page 4: ...o not fix to the Floor until the Roof is fitted Step 6 Place a Roof panel No 7 onto the build ing making sure the Roof rests into the gaps in the framing in the front and back panel Fix as shown with...

Page 5: ...m Fix the Cover Strips No 14 to the corners of the building with 3x30mm screws per trim The Trims attached to the front of the building will need to be cut to fit at angle Repeat for the rear of the b...

Page 6: ...anels that accomodate a window First fix the Window Block to the Window as shown with 1x30mm screw Place the Window into the window hole and fix by screwing though the Window Block No 22 with 2x30mm s...

Page 7: ...ials No 23 to the building with 2x30mm screws per Finial 4x30mm screws Pre drill hole 30mm screw Step 17 Fix a Ring Pull No 19 to each door with 4x20mm black screws per Finial 8x20mm black screws Pre...

Page 8: ...point 12x20mm screws 6x10mm screws Pre drill hole 10mm screw Step 19 Fix the Turn Buttons No 21 to the top of each door with 1x20mm black screw per Button 2x20mm black screws Pre drill hole 20mm screw...

Reviews: