mcr PL1
overpressure-bleed damper
MERCOR SA –
The Company reserves the right to make modifications and changes.
6/9
5. DESIGNATION OF THE DAMPER __________________________________
mcr PL1 B x H / Z
6. INSTALLATION OF THE DEVICE __________________________________
The mcr PL1 damper is designed for vertical installation. Due to the special operation of the device
and the applied technical solutions, the damper has to be mounted in a suitable position according to the
instructions given on the casing by the manufacturer.
6.1. PRE-INSTALLATION INSPECTION __________________________________________
Each damper is inspected before packing and shipment by the manufacturer. After unpacking at the
recipient, perform visual inspection to check if the casing has not been deformed and whether the
damper has not been damaged during transport.
6.2. INSTALLATION OPENING _________________________________________________
The minimum size of the opening permitting correct installation of the damper is (B+30)x(H+30)mm.
góra
Kierunkek przepływu
dół
Installation opening
Direction and position of a damper installation
version (K – duct-mounted, S – wall-mounted)
gross dimensions of the damper: breadth x height
[mm]
commercial designation – a damper without
accessories
Flow direction
top
bottom