mcr S-THERM smoke exhaust vents: C, E, NG-A. OPERATION AND MAINTENANCE MANUAL
Page 29 of 41
Fig. 51Method of installing the flexible pneumatic lines.
Fig. 52 Connection of the screw connection to the copper/steel pipe.
NOTE:
For safety reasons during transport, the thermal fuse in the vent is not armed.
After installation of the vent (including flashing) on the roof, any possible play in the vent leaf
must be eliminated and the thermal fuse armed.
Arming the thermal fuse:
check if pin spring tensioning screw (1) is
unscrewed; if not, it should be unscrewed by
hand till the stop,
install the alcohol ampoule (2) in the seat of
the gas regulator with the pointed end
towards the body; tighten the clamping
screw of the ampoule by hand
slide in the valve slide (4),
tighten the pin spring with the screw (1) as
far as it will go - manually,
check that the cartridge pin is retracted, and
that a seal is present in the cartridge seat,
manually screw in the CO
2
cartridge (3).
Fig. 53 Thermal fuse (TAVZ 3 shown as example).
Nut
Cable
Clamping collar
Sleeve (for plastic
lines)
Body
Copper tube
Clamping collar
Nut
Body
3
1
2
4