INSTALLATION STEP 2
Install the Header Bracket
You can attach the header bracket either to the wall above
the garage door, or to the ceiling. Follow the instructions
which will work best for your particular requirements.
Do
not install the header bracket over drywall. If installing
into masonry, use concrete anchors (not provided).
WALL HEADER BRACKET INSTALLATION
• Center the bracket on the vertical centerline with the
bottom edge of the bracket on the horizontal line as
shown
(
with the arrow pointing toward the ceiling
)
.
•
M
ark the vertical set of bracket holes
(
do not use the
holes designated for ceiling mount
)
. Drill 5 mm pilot
holes and fasten the bracket securely to a structural
support with the hardware provided.
L
ag Screw
5/16
"
-9x1-5/8
"
HARDWARE SHOWN ACTUAL SIZE
Lag Screws
5/16"x9x1-5/8"
Highest Point of
Garage Door Travel
Vertical
Centerline of
Garage Door
Header
Wall
Garage
Door
UP
CEILING MOUNT ONLY
Wall Mounting Holes
Optional
Wall Mounting Holes
The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket.
UP
CE
ILIN
G M
OU
NT
O
NL
Y
Door Spring
Header
Bracket
38 mm
Board
Vertical Centerline
of Garage Door
UP
CEILING MOUNT ONLY
Ceiling Mounting Holes
The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket.
UP
Lag Screws
5/16"x9x1-5/8"
Garage Door
Vertical Centerline
of Garage Door
Header Wall
– Finished Ceiling –
Header
Bracket
15 cm Maximum
Vertical
Centerline of
Garage Door
Door
Spring
CEILING HEADER BRACKET INSTALLATION
• Extend the vertical centerline onto the ceiling as shown.
• Center the bracket on the vertical mark, no more than
15 cm from the wall.
M
ake sure the arrow is pointing
toward the wall. The bracket can be mounted flush
against the ceiling when clearance is minimal.
•
M
ark the side holes. Drill 5 mm pilot holes and fasten
bracket securely to a structural support with the
hardware provided.