7 - PERIODIC SAFETY INSPECTIONS
7 - 2
PERIODIC INSPECTION RECORD SHEET
The following card must be reproduced (i.e. photocopied) and used to record the inspections to be carried out following the
periods as reported in the table. If the box between the line and the column is not highlighted, inspection is not necessary. The
operations hereafter listed must be carried out following the deadlines in working hours or in months, whichever come first.
Inspections of the machine and following recording on the card must be carried out by the person in charge of the operations
(e.g. Owner, site manager, etc.). The duly filled in cards must be kept by the machine user and must be at disposal for possible
checking by the authorized inspection organism.
P37.12 PLUS
TYPE OF MACHINE
CHASSIS NUMBER
NAME OF CONTROLLER
FUNCTION TO BE CHECKED
PERIOD IN HOURS / MONTHS
Every
250 hours or 2 months
Every
500 hours or 6 months
Every
1000 hours or 1 year
Control
Date
Restoration
Date
Control
Date
Restoration
Date
Control
Date
Restoration
Date
Functioning of the anti-overturn system
acoustic alarm
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
Functioning of the anti-overturn system
visual alarm
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
Functioning of the anti-overturn system
movement locking
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
Functioning of the locking system of the
levelling and shifting command distributor
with raised boom
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
Make sure that the operating and
maintenance instruction manual is in the cab
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
Check spirit level calibration
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
.../.../...
Check the maximum pressure in the
oleodynamic system
.../.../...
.../.../...
.../.../...
.../.../...
Check the jack locking valves
.../.../...
.../.../...
.../.../...
.../.../...
Check the parking brake
.../.../...
.../.../...
.../.../...
.../.../...
Check of the three steering operating modes
.../.../...
.../.../...
.../.../...
.../.../...
Check the power steering unit calibration
pressure
.../.../...
.../.../...
.../.../...
.../.../...
Check the boom extension and retraction
chains
.../.../...
.../.../...
.../.../...
.../.../...
Check, inside the cab and on the machine,
for the presence and condition of the
instruction plates
.../.../...
.../.../...
Signature:
Machine total working hours:
WARNING! Before beginning any of the checking operations (described below) which require machine
movement, make sure there are no people or objects in its radius of operation. Furthermore, for operations which
require a load to be lifted, ensure that the machine is on a compact surface and is fully level.
Should any anomalies be identified during these checks, do not use the machine before they have been resolved.
Summary of Contents for PANORAMIC
Page 20: ...2 MACHINE TECHNICAL INFORMATION 2 9 only for models P60 10EE P72 10EE...
Page 27: ...2 MACHINE TECHNICAL INFORMATION 2 16 DIMENSIONS P37 12 PLUS DIMENSIONS P38 12 PLUS P38 12...
Page 30: ...2 MACHINE TECHNICAL INFORMATION 2 19 DIMENSIONS P60 10 P60 10EE DIMENSIONS P72 10 P72 10EE...
Page 35: ...2 MACHINE TECHNICAL INFORMATION 2 24 LIFTING A LOAD...
Page 44: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CAB 3 3 only for models P60 10EE P72 10EE...
Page 49: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CAB 3 8...
Page 51: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CAB 3 10...
Page 52: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CAB 3 11 P37 12 PLUS P40 9 PLUS...
Page 53: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CAB 3 12...
Page 54: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CAB 3 13 P60 10 P72 10 P60 10EE P72 10EE...
Page 55: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CAB 3 14 END OF SECTION...
Page 138: ......
Page 185: ......
Page 197: ...10 ELECTRICAL SYSTEM 10 1 CONTENTS GENERAL FEATURES 2 BATTERY 2 FUSES 3 END OF SECTION 4...