4
1. Turn Off Your Power
Begin installation by removing fuses or turning off
circuit breakers to the wiring you will be using. Use
your compatible UL listed junction box if you already
have one installed.
Failure to disconnect the power supply prior to
installation may result in serious injury or death.
2. Choose Your Mounting Position
If you need to install a new UL listed junction box,
secure it directly to your building's structure
usingappropriate fasteners and materials. Do not
use plastic boxes. The junction box and its supports
must be able to support the
MOVING
weight of the
fan (at least 50 lb.) and be rated for fan support.
3. Choose a Suitable Location
Ensure the blades will be at least 30 inches from
any obstruction and at least 7 feet above the floor. In
locations without a ceiling joist, a hanger support bar
may be required. Do not install in damp locations.
Preparation