background image

1.   

 

2. Connect the drainpipe to the cloaca.
3. Fix shower head and pillow.
4. Connect to the cool(blue) and hot(red) water pipe.
5. Connect to power source, then fill water to have a test.

Voltage: 220V-240V   50Hz /60Hz                    
Power: 1HP x2  
Hydraulic pressure : 0.1

0.2Mpa

Size: 1800x1500x700mm

1.

Fill water 

Turn the cool/hot switch to adjust the water temperature, turn the shift 
switch  to  fill  water  through  shower  head  or  faucet  or  waterfall.  Stop 
to fill water when the water level is 10-20mm above the water jet.

2.

Hydraulic massage

Press the pump switch to start the pump and bubble pump,then  there 
will  be  bubble  come  out  from  the  air  bubble  jets  and  turn  the  air 
regulator  to  adjust  the  hydraulic  power.  Push  the  jet  to  change  the 
water spray direction. Press the switch again to turn off the pump.

3.

Shower

Turn the cool/hot water switch to get suitable temperature, then turn 
the shift switch to use shower head to take a shower.

4.

Power off

Press the pump switch to turn off the pump, then turn the drain switch 
to  let  out  the  water,when  stop  use  ,turn  off  the  power  source  switch 
and the water supply switch. 

Adjust the feet-screw  to make the bathtub horizontal.

Parameter

Operation

Installation

150

450

450

1500

650

750

90

0

cold

 

water

hot

 

 

water

 

tap

shower

drainage

1

2

3

4 5

6

7

8

9

12

10

11

1.

small

2.

ater  inlet

3.

ig nozzle

4

 

nozzle

w
b

switch

5.air  conditioning
6.pil low

10.drainage switch

.hot water switch

water  pump 

7.

drainage

8.

shower

9.

tap

11

 

 

12

.shift switch

13.

cold

 

water

 

switch

 

13

1800

900

Sketch

board panel

wood panel