CCS MODEM-9800 Manual Rev A
Page 7
Alternatively the CCS Modem can collect and report measurement data from 1 of the following
compatible Met One Instruments, Inc. datalogging devices and monitors:
E-BAM PLUS
PM10 or TSP Particulate Mass
Automet 580
Datalogger and any connected sensors
Multi-Met 136
Translator and any connected sensors
E-Sampler
PM2.5, or PM10, or TSP Particulate Mass
BAM-1022
PM2.5, or PM10, or TSP Particulate Mass
E-BAM*
PM2.5, or PM10, or TSP Particulate Mass
BC 1060
PORTABLE BLACK CARBON MONITOR - 2 CHANNEL
*E-BAM must be of newer 2019+ design. Ask Met One Sales/Service department to confirm if you
wish to connect an existing monitor to the CCS MODEM.
Connect the appropriate sensor cable(s) to each sensor, and to the CCS Modem’s communication
ports.
CCS Bottom Connector Plate
Powering on the Device
Connect the included DC power cable to a 12VDC power source, or optional 9438-4 AC power
supply to an AC outlet. Next connect the DC cable connector to the power connector on the
underside of the CCS Modem.
Once the CCS Modem and connected sensors are powered on, they will automatically begin to
sample and report data to the Cloud at the proper interval (15 minutes in the USA standard, 5
minute optional, 60 minutes Global version, 15 minute rate optional). Please allow several data
intervals worth of time for the first data points to appear.
CCS Power
Supply Input
Connector
Sensor Connector
Sensor Connector