Fix L04A onto 03-L02B as shown, using Z02.
Attention:
Y3 must be placed
into the channel
of L04A/L01A
at the same time.
Make sure all the
panels are in the
right position
before fixing Z02.
Insert L11 into L04A as shown,
and fix it with L04A using Z02;
Fix 03-L02A with
L01A and L04A,
using Z01 & Z02.
Cover all the holes with J01
19
Summary of Contents for 142-2-5
Page 4: ...142 2 5 PC Box PART NO Y1 QTY 4 6 6 1 4 Y2 Y3 Y9 PC BOX Y10 3...
Page 9: ...Window Assembly 8...
Page 10: ...Fix one L05A onto L01A and the other one onto L04A using Z02...
Page 13: ...Fix the wheels onto L01A 3PCS using S01 M01 Fix L01A 2PCS onto 02 L02A using Z01 12...
Page 16: ...Fix CX 2PCS onto 02 L02A 10MM away from the bottom using Z03 Cover all the holes with J01 15...
Page 22: ...PART NO QTY L06A L12 12 6 4 L13 J01 J02 60 60 Z01 M6X60 Z02 60 24 M4 2X16 21...