14
PRM FH | Version 1.04 | EN
Assembly
7
Assembly
7.1 Set up
Requirements to the place of instal-
lation
To achieve a good functioning of the ring bending machine and a long service
life, the site should meet the following criteria:
- The foundation must be level, firm and vibration-free.
- The foundation must not let any lubricant through.
- The installation or working room must be dry and well ventilated.
- Do not operate machines that cause dust and chips near the ring ben-
ding machine.
- Sufficient space must be available for the operating personnel, for mate-
rial transport and for adjustment and maintenance work.
- The site must have good lighting.
Dimensions
Fig. 6: Dimensions of the ring bending machines PRM 50 FH (left) and PRM 60 FH (right)
The following size specifications should be taken into account at the place of
installation or workplace (Fig. 7):
WARNING!
Danger to life due to undersized buildings!
Overloading of ceiling structures leads to serious property
damage and bodily injury up to death!
- If the machine is placed on a self-supporting building cei-
ling, the dynamic loads due to the movements must be ta-
ken into account - the foundation must support the ma-
chine.
NOTE!
Properly damage due ro uneven ground!
An uneven surface causes deformation within the machine.
This leads to an inaccurate machining of the workpiece.
- Set up the machine on a flat and level surface.