14
RBM E | Version 1.07
Set up and connection
7
Set up and connection
7.1 Set up
Requirements for the installation
site
In order to achieve good functionality and long life of the bender, the site
should meet the following criteria.
- The substrate must be level, firm and vibration-free.
- The installation or working room must be dry and well ventilated.
- Do not operate machines that cause dust and chips near the bender.
- There must be sufficient space for the operating personnel, for material
transport as well as for adjustment and maintenance work.
- The site must have good lighting.
Space requirement
Fig. 8: Space requirement of the machine
The measure of the space requirement on the right side of the machine should
be slightly larger than a roll length and allow easy material removal.
The amount of space required in front of and behind the machine should be
calculated so that the operator can easily feed the material and remove it from
the machine.
Set up the plate rolling machine
WARNING!
Risk of crushing!
The machine may tilt during deployment and cause serious
injury.
- The machine must be set up by at least 2 people together.
Wear safety gloves!
Wear safety shoes!