11
OPERATION MANUAL
The machine must be leveled and firmly stationed on the floor where it is to be used, according to
the Installation Diagram attached.
The floor load, must be suitable for the weight of the machine.
3. INSTALLATION
Before securing the machine a solid concrete base must be prepared to the specification of the
machine.
The sizes for the bolt holes position are listed as A-B listed in the chart below. Check the sizes with
the distributer
Model
A
B
C
D
E
F
G
HG-2504 3500 2840 1000 1750 300 130 100
HG-2506 3500 2880 1150 1900 300 130 100
HG-3206 4200 3583 1350 1900 300 130 100
HG-3212 4700 3655 1450 2350 430 180 350
HG-4005 5000 4382 1500 1900 300 130 100
HG-4012 5500 4445 1550 2550 480 160 350
Table of Measurement
3.1 BASE FOUNDATION AND SECURING POINTS
Page 11
Instructions Manual for HG-4012 (S948)
12/02/2018