Quick Installation Manual REV:202106
OH6425-OG1
Outdoor Cabinets for OFF-GRID Systems
www.metel.eu 8/10
www.iplog.eu
Installation
Use the mounting holes in the corners for mounting.
On a Flat Surface
Use the KIT-OH mounting kit. See page 9.
On the Column
Use the HOLDER-OH6425 mounting kit. Page 10 shows
the connection of the switchboard with U-profiles,
stainless steel strips and a column. The set is intended
only for use on round columns with a diameter in the
range: 150 - 215 mm. The switchboard must always be
installed in a vertical position with the glands facing
downwards. When mounting, use fasteners in accordance
with the instructions in this manual.
2. Grounded Cabinet and Overvoltage Protections
Ground the cabinet with a stranded or solid Cu conductor
with a cross section of 10 - 16mm2. Screw the wire into
the green-yellow terminal block located on the right
of the bottom DIN35 rail. The earth resistance must be
within 10
4. Connection of Photovoltaic Panels
5. Connection of PLC and Other Hardware
Use the mounting holes in the corners for mounting.
On a Flat Surface
Use the KIT-OH mounting kit. See page 9.
On the Column
Use the HOLDER-OH6425 mounting kit. Page 10 shows
the connection of the switchboard with U-profiles,
stainless steel strips and a column. The set is intended
only for use on round columns with a diameter in the
range: 150 - 215 mm. The switchboard must always be
installed in a vertical position with the glands facing
downwards. When mounting, use fasteners in accordance
with the instructions in this manual.
2. Grounded Cabinet and Overvoltage Protections
Ground the cabinet with a stranded or solid Cu conductor
with a cross section of 10 - 16mm2. Screw the wire into
the green-yellow terminal block located on the right
of the bottom DIN35 rail. The earth resistance must be
within 10
4. Connection of Photovoltaic Panels
5. Connection of PLC and Other Hardware
1
3
2
4
Installation, adjustment and operation may only be performed by a person wit h appropriate electrical qualifications
Installation, adjustment and operation may only be performed by a person who is fully acquainted with this manual
Connecting PV panels and must be installed in accordance with the regulations and standards applicable in the country
•
Installation must not be performed during a thunderstorm
•
The installation must be complied with safety regulations and standards applicable in the country
Indicates the battery connection and which load output control algorithm has been selected
The charger is set to a conventional load output control algorithm.
The output load control algorithm is set to BatteryLife.
No power supply from PV panels (night, low light intensity) or PV panels connected in opposite polarity.
Fast charging phase, battery charge is between 0% and 80%.
Absorption charging phase, the state of charge of the battery is between 80% and 100%.
Maintenance phase of charging, the battery is fully charged, the state of charge is 100%.