meteocontrol Power Control 03082012 - en
63/78
Fig. 40: Connection ripple control receiver <> WEB`log
(1)
Ripple control receiver
(4)
Digital input DI 3
(2)
Digital input DI1
(5)
Digital input DI 4
(3)
Digital input DI2
(6)
WEB`log
•
If internal WEB`log inputs (WEB`log DIs) are used, feedback signals are
not supported.
•
If Power Control is activated, the digital inputs must not be configured
otherwise by the WEB`log.
•
Ripple control receivers with pulse output are not supported.
A PCU must be used for pulse evaluation.
10.1.2 WEB`log Pro master - slave
+ -
+ -
- +
- +
- +
- +
- +
- +
- +
- +
DI1
DI1
DI1
DI1
AI1
AI2
AI3
AI4
RESET
Phone
Ethernet
RS485
RS232
24 V
DO1
AC
230 V
110 V
N L
+ -
+ -
- +
- +
- +
- +
- +
- +
- +
- +
DI1
DI1
DI1
DI1
AI1
AI2
AI3
AI4
RESET
Phone
Ethernet
RS485
RS232
24 V
DO1
AC
230 V
110 V
N L
+ -
+ -
- +
- +
- +
- +
- +
- +
- +
- +
DI1
DI1
DI1
DI1
AI1
AI2
AI3
AI4
RESET
Phone
Ethernet
RS485
RS232
24 V
DO1
AC
230 V
110 V
N L
2
3
1
2
4
5
5
5
Fig. 41: Master-slave connection
(1)
(2)
WEB`log PRO Master
WEB`log PRO Slave
(4)
Connection WEB`log PRO
master with Ethernet switch
(3)
Ethernet switch
(5)
Connection WEB`log PRO slave
with Ethernet switch
•
All WEB`log devices must be in the same network (subnet mask).
•
Every WEB`log must be assigned its own IP address.
•
A maximum of two WEB`log devices may be directly connected via a
cross cable.
•
For more than two WEB`log devices, an Ethernet switch is required.