background image

4

USING APOGEE UV SENSORS WITH ZENTRA SYSTEM

2.1  SET UP MOUNTING ASSEMBLY

Apogee UV sensors must be level to accurately measure UV irradiance incident on a 
horizontal surface. Each Apogee UV sensor purchased from METER comes with an 
AL-120 Solar Mounting Bracket with Leveling Plate. The AL-120 can be mounted to either a 
horizontal or vertical post, depending on which set of holes is used.
1.  Align the cable M8 connector pins with the sensor M8 connector holes and seat 

connectors fully.

2.  Tighten the cable screw until hand-tight (

Figure 1

).

M8 connectors are easy to overtighten. Do not use pliers or other tools to tighten 
this connector.

Cable screw

Figure 1  Attach M8 connector

3.  Mount the sensor to the leveling plate (

Figure 2

) with the included nylon screw.

\

Mounting bracket 
(AL-120)

Sensor
(SU-221)

Leveling plate

U-bolt

Figure 2  Apogee UV sensor installed on mast or pipe

4.  Attach the leveling plate to the mounting bracket using the included three machine screws. 
5.  Attach the mounting bracket either to a horizontal arm (

Figure 2

) or vertical post using 

the included U-bolt.

Summary of Contents for APOGEE SU-221

Page 1: ...APOGEE UV SENSOR...

Page 2: ...CONTENTS 1 Introduction 2 2 Installation 2 2 1 Set Up Mounting Assembly 4 2 2 Connect to METER ZENTRA Series Logger 5 3 Data Interpretation 6 4 Troubleshooting 6 5 Customer Support 7 Index 8 18443 00...

Page 3: ...1 p a g e e I N S T R U M E N T S Made in USA...

Page 4: ...y before going out to the field For more information on Apogee sensors please review the Ultraviolet A Radiation Sensor User Manual or visit the Apogee UV sensor product page apogeeinstruments com uv...

Page 5: ...Northern hemisphere or true South in the Southern hemisphere to reduce azimuth error Secure the System Tighten the U bolt nuts by hand until hand tight and then tighten with a wrench CAUTION Do not ov...

Page 6: ...ensor M8 connector holes and seat connectors fully 2 Tighten the cable screw until hand tight Figure 1 M8 connectors are easy to overtighten Do not use pliers or other tools to tighten this connector...

Page 7: ...data loggers 1 Plug the stereo plug connector into one of the sensor ports on the logger Figure 4 Port 1 Port 2 Port 3 Port 4 Port 5 Port 6 TEST OK ERROR Conduit Figure 4 Logger connection 2 Connect t...

Page 8: ...not responding Check power to the sensor and logger Check sensor cable and stereo plug connector integrity Check that the SDI 12 address of the sensor is 0 factory default Check this with ZENTRA Util...

Page 9: ...Customer support representatives are available for questions problems or feedback Monday through Friday 8 00 to 17 00 Central European time Email support europe metergroup com sales europe metergroup...

Page 10: ...I installation mounting 3 4 preparation 3 tools needed 2 M mounting 3 mounting bracket 2 4 R recalibration 6 S stereo plug connector 5 T troubleshooting 6 U U bolt 3 4 ultraviolet radiation 2 4 user m...

Page 11: ...ins Court Pullman WA 99163 T 1 509 332 2756 F 1 509 332 5158 E info metergroup com W metergroup com METER Group AG Mettlacher Stra e 8 81379 M nchen T 49 89 1266520 F 49 89 12665220 E info europe mete...

Page 12: ......

Reviews: