Table 1 Installation (continued)
Field Site
Preparation
Check Cellular Signal
Once at the field site, check that the cellular signal is strong enough to
collect and transfer data to ZENTRA Cloud.
• Remove the rain funnel.
• Press the
TEST button.
• Connect to device in ZENTRA Utility Mobile.
• Tap
Test in ZENTRA Utility Mobile to check the quality of the cellular signal
before finalizing installation
(
).
• Replace the rain funnel.
If the cellular signal is low or the cellular test fails, move to an alternative
location (sometimes moving only a few meters is sufficient).
If there is significant bird activity at the site, consider using a bird deterrent
kit. Contact
for more information.
Install Mounting Pole
Use a mounting pole with a 31.8- to 50.8-mm (1.25- to 2.0-in) diameter.
Prepare the mounting pole to the appropriate height. Many installations
require the ATMOS 41W to be mounted 2 m above ground, but mounting height
can be adjusted based on the specific application.
The mounting pole should be within 4.5° of level.
Level mounting
pole within
4.5° of level