49
ATMOS 41W
To access the
TEST button, remove the rain funnel (
Section 3.2.2.1
) and press the
TEST
button (
Figure 28
) to initiate the self-test sequence. The self-test can take 60 s or more if
testing communications over the cellular network.
TEST button
Figure 28 TEST button
The following actions are part of the self-test sequence. This sequence happens after
replacing batteries or pressing the
TEST button:
1. Reboot the ATMOS 41W.
This ensures the internal software restarts and operates in the expected way. Both
status lights stay on during the reboot. This reboot will not erase data or reset settings.
2. Perform basic functionality testing on internal systems, and evaluate the amount of
charge in the battery
.
Table 4 Internal System Functionality Testing
Internal Tests
Light Indication
Request current time and location fix
(
Green and red light blink slowly togheter while
test running
Establish internet connection over cellular
network and attempt to communicate with
ZENTRA cloud.
Green and red light blink slowly together while
test running
Enable Bluetooth module to allow connection
with ZENTRA Utility Mobile.
Green and red light blink slowly together while
test running
Test success
Green light solid for ~20 s