DOMITOR DM/DB
Maintenance
GB - 24
FIG. 4
FIG. 5
6.1.d.b - Lamp replacement (Fig 4)
• Unscrew the glass (1) protecting the lamp (2).
• Unscrew theburnt out lamp (2) and replace it, then
reassemble all by proceeding in the opposite way.
6.1.d.c - Ceiling or bedplate resistance replacement
(Fig 5)
DANGER
This operation shall be carried out by skilled tech-
nicians.
To access the resistance, the oven covering mineral
wool shall be moved, therefore, it is necessary to
use suitable individual protection means.
• The user shall place himself at the rear side of the
oven and remove the rear panel (1) with chimney,
loosening the relevant screws.
• Remove the oven covering mineral wool (2), loosen
the resistance fi xing screws (3) (two per resistan-
ce).
• Electrically disconnect the resistance, then open the
oven door.
Bedplate
resistance:
After opening the oven door, take off the refractory
surface and the resistance to be replaced, as well.
Ceiling
resistance:
after opening the oven door, remove the split pins
(4), take off the resistance support bar (5) then, take
off the resistance to be replaced.
• Replace the resistance and mount again proceeding
in the reverse order taking care of a proper power
supply cable connection.
Summary of Contents for DOMITOR
Page 1: ...Installation and Operation Manual PIZZA OVEN DOMITOR...
Page 2: ......
Page 4: ......
Page 42: ......