2.11.2005
Rev. 1.5
Installation
34
5.2.2
Surface installation frame fixed to the floor
Surface frames are mounted according to the installation drawing, with the help of dis-
tance guides supplied with the delivery. If the inclination of the floor is very steep, it may
be necessary to level the surface frame closer to the horizontal by placing stainless steel
spacers between the frame and the floor. This will ensure that the adjustment range of the
pillars is adequate.
Pieces of stainless steel plate should be used as spacers that are large enough and have a
suitable hole for the fixing bolt. Washers or other small spacers are not allowed.
The fixing bolts for the surface installation must be chosen according to the floor con-
struction. A type recommended is a UKA M10x150 chemical bolt, which suits various
floor materials. The junction of the surface frame and the floor is filled with flooring ma-
terial or silicone mastic. To achieve the best result regarding tightness, the installation
frame should be filled up to the top level e.g. with acrylic filler
after the installation
. The
main points concerning the installation of the surface frame are shown in the picture be-
low. For more detailed installation instructions, see the installation drawings.
1.
Surface frame
2.
Concrete casting
3.
Fixing bolt for surface frame
4.
Finished floor surface
5.
Silicone mastic
6.
Acrylic filler
1
5
4
6
3
2
Summary of Contents for PROVENO S 100
Page 2: ......
Page 4: ...2 11 2005 Rev 1 5...
Page 7: ...2 11 2005 Rev...
Page 8: ...2 11 2005 Rev...
Page 62: ...Connection diagram S00123 B3...
Page 63: ...Installation drawing L00115 B3...
Page 64: ...Text part ChillPlus L00114 A4...
Page 65: ...Steam supply recommendations 000030 A4...
Page 68: ......